Similar Projects
C Menomonie, CTH B Construction / Reconstruction
Infrastructure
Design
$4,000,000 CJ est. value
Colfax, WI 54730

C Menomonie, CTH B Construction / Reconstruction
Infrastructure
Design
$4,000,000 CJ est. value
Colfax, WI 54730

2021 Road Paving
Infrastructure
Post-Bid
Sand Creek, WI 54757

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1058th Avenue Paving & 970th Avenue Chip Sealing
Results
Wheeler, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Menomonie, WI 54751

STH 72, Ellsworth - Downsville, Pierce/Dunn County Line to STH 25
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Menomonie, WI 54751

Town Road Reconstruction
Infrastructure
Post-Bid
$284,000 est. value
Modena, WI

Crestwood Acres Neighborhood Street Reconstruction
Results
Weston, WI

Road Repair to 575th Street
Infrastructure
Construction
$7,263 CJ est. value
Tainter Lake, WI 54751

STH 40, Elk Mound - Bloomer, CTH M to CTH B E JCT, Dunn
Infrastructure
Pending Verification
$8,000,000 CJ est. value
Menomonie, WI 54751

Menomonie - Ridgeland; S Fork Lower Pine Creek C-17-0049
New Construction, Infrastructure
Post-Bid
$500,000 to $749,999 est. value
Menomonie, WI 54751

Last Updated 12/02/2022 01:35 PM
Project Title

WIS 72. Pierce/Dunn County Line (Town of Weston) - WIS 25 (Town of Dunn) - Wisconsin Department of Transportation

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $5,999,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2, 2022, an engineer has been selected and this project is in the preliminary design phase. Design firm information has not been disclosed. Although a firm timeline for construction has not been determined, construction is expected to start in 2026. The 10.1-mile segment runs from the Pierce/Dunn County line in the town of Weston to WIS 25 in the town of Dunn, all in Dunn County. Overview The existing asphalt pavement on WIS 72 is showing signs of deterioration. To address this, the Wisconsin Department of Transportation is proposing to: Remove 2.25 inches of the existing asphalt pavement and place 3.25 inches of new asphalt. Install centerline rumble strips. Place and compact aggregate on the road shoulder. Replace the four wing walls on the Knights Creek Bridge. Complete culvert maintenance, including adding riprap to the box culvert east of 220th Street and sealing the joints on the box culvert east of 290th Street. Clear culverts and ditches. Replace guardrail. Mark the pavement. Complete restoration work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents