Similar Projects
I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

Town Center - Utility and Woonerf Project
Infrastructure
Bidding
$5,000,000 to $6,100,000 est. value
Sumner, WA

ASOG Complex
New Construction, Infrastructure - 71,600 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Murray, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Bidding
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Ls Resurfacing 1
Term Contract
Post-Bid
$997,219,550 est. value

Puyallup Avenue Transit - Street Improvements
Infrastructure
Results
$100,000 est. value
Tacoma, WA

PCT Operational Pavement Repair 2022
Infrastructure
Bidding
$110,000 est. value
Tacoma, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Right Abutment Access Road Remidiation
Alteration
Results
$100,000 to $120,000 est. value
Shelton, Tacoma, WA

2022 Asphalt Overlay Program - Various Locations CRP 5913
Infrastructure
Post-Bid
$3,000,000 to $5,000,000 est. value
Tacoma, WA

Transfer Lead Upgrades
Infrastructure
Results
$251,000 est. value
WA

92nd Avenue East/224th Street East
Alteration
Results
$2,700,000 to $4,000,000 est. value
WA

Last Updated 05/06/2022 02:25 PM
Project Title

CRP 5913 2022 Overlays

Physical Address View project details and contacts
City, State (County) Bonney Lake, Parkland, Tacoma, WA 98391   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Group 1 - McCutcheon Road East (Canyon Falls Creek to Fennel Creek) (Base Bid) This work provides for resurfacing approximately 1.52 lane miles of McCutcheon Road East by resurfacing the roadway with Hot Mix Asphalt. Group 2 - Sumner Tapps Highway East (250' NE/O West Tapps Drive East to 16th Street East) (Additive Bid) This work provides for resurfacing approximately 1.2 lane miles of Sumner Tapps Highway East by resurfacing the roadway with Hot Mix Asphalt. Group 3 - C Street South (112th Street South to Park Avenue South) (Additive Bid) This work provides for resurfacing approximately 0.54 lane miles of C Street South by resurfacing the roadway with Hot Mix Asphalt. Group 4 - Park Avenue South (C Street South to Yakima Avenue South) (Additive Bid) This work provides for resurfacing approximately 2.49 lane miles of Park Avenue South by resurfacing the roadway with Hot Mix Asphalt. Group 5 - Yakima Avenue South (Park Avenue South to 96th Street South) (Additive Bid) This work provides for resurfacing approximately 0.33 lane miles of Yakima Avenue South by resurfacing the roadway with Hot Mix Asphalt. Group 6 - 120th Street East (300' E/O 198th Avenue East to South Prairie Road East) (Additive Bid) This work provides for resurfacing approximately 4.88 lane miles of 120th Street East by resurfacing the roadway with Hot Mix Asphalt. Group 7 - 152nd Street East (SR 161 to 250' E/O 118th Avenue Court East) (Additive Bid) This work provides for resurfacing approximately 2.78 lane miles of 152nd Street East by resurfacing the roadway with Hot Mix Asphalt. Group 8 -Waller Road East (72nd Street East to 400' S/O Pioneer Way East) (Additive Bid) This work provides for resurfacing approximately 5.1 lane miles of Waller Road East by resurfacing the roadway with Hot Mix Asphalt. Group 9 -Carbonado-Wilkeson Road (AP Tubbs Road East to Town Limits) (Additive Bid) This work provides for resurfacing approximately 0.4 lane miles of Carbonado-Wilkeson Road by resurfacing the roadway with Hot Mix Asphalt

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents