Similar Projects
Crack Sealing and Crack Repair
Bidding
Blue Hill, Dover Foxcroft, Orland, Sebec, ME 04614

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

2019 Pavement
Post-Bid
Bucksport, ME

Paving Renovation Project at Ridge Apartments
Results
$30,000 to $45,000 est. value
Southwest Harbor, ME

(LCP) Light Capital Paving and Profile Milling
Results
$2,600,000 est. value

Rehabilitate Eagle Lake Carriage Road at Acadia National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Bar Harbor, ME 04609

Pavement Milling, Ultra-Thin Bonded Wearing Course Overlay
Results
Less than $3,300,000 est. value
Ellsworth, Orland, ME

2019 Airport Roadway Improvements
Results
Trenton, ME

On Call Maintenance Paving
Results

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $670,000 est. value
Hancock, Sullivan, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Bucksport, Orland, ME

Paving Shipyard Point, Cards Crossing from Sunrise Trail Crossing to 200 and Community Center Parking Lot
Results
Franklin, ME

Paving Donnell Pond Road
Results
Franklin, ME 04634

Two Paving Projects
Results
Sullivan, ME

Paving 2019
Results
Hancock, ME

Last Updated 02/28/2019 04:38 AM
Project Title

(LCP) Light Capital Paving

Physical Address View project details and contacts
City, State (County) Castine, ME   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $810,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Light Capital Paving and other incidental work. Location: In Hancock County, project is located: Map ID 1 is in Penobscot on Route 199 beginning at the intersection with Route 166A and extending notheasterly to the intersection with Route 15. Map ID 2 is in Castine on Route 166A beginning at the southerly intersection with Route 166 and extending notherly to the notherly intersection with Route 166. Map ID 3 is in Verona Island on West Side Drive and East Side Drive beginning at the southerly intersection with Route 1/3 and extending southerly then northerly to the notherly intersection with Route 1/3.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents