Similar Projects
Last Updated | 05/14/2020 09:11 AM |
Project Title | 2020 Asphalt Overlay Project |
Physical Address | View project details and contacts |
City, State (County) | Waynesboro, GA 30830 (Burke County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location: Cates-Mead Road Winter Road Burke County- Cates-Mead Road 1. Beginning At Sr 56 Intersection For a Distance Of 4.11 Miles And Ending At Seven Oaks Road. Level With 90lbs/Sqyd Of Asphaltic Concrete Open Graded Interlayer. Resurface With 135lbs/Sqyd Of 9.5mm Mix. Restripe Centerline And Edge Lines Including Stop Bars. Average Width 21 Ft. All Driveways And Unpaved County Roads Shall Have Minimum 2ft Aprons. Paved County Side Road, Sam Mead Road Shall Have 30ft Apron Including Stop Bar. Burke County- Winter Road 2. Beginning Approximatley 500ft West Of Us 25 Intersection At Paving Joint For a Distance Of 2.43 Miles And Ending At Storymill Road. Spot Level With 9.5mm Mix As Directed By Road Superintendent. Resurface Roadway With 160lbs/Sqyd Of 9.5 Mm Mix. Restripe Centerline And Edge Lines. Autumn Road Shall Have 30 Apron Including Stop Bar. All Driveways And Unpaved County Roads Shall Have Minimum 2 Ft Aprons. Average Width 21ft. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |