Last Updated 05/14/2020 09:11 AM
Project Title

2020 Asphalt Overlay Project

Physical Address View project details and contacts
City, State (County) Waynesboro, GA 30830   (Burke County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Cates-Mead Road Winter Road Burke County- Cates-Mead Road 1. Beginning At Sr 56 Intersection For a Distance Of 4.11 Miles And Ending At Seven Oaks Road. Level With 90lbs/Sqyd Of Asphaltic Concrete Open Graded Interlayer. Resurface With 135lbs/Sqyd Of 9.5mm Mix. Restripe Centerline And Edge Lines Including Stop Bars. Average Width 21 Ft. All Driveways And Unpaved County Roads Shall Have Minimum 2ft Aprons. Paved County Side Road, Sam Mead Road Shall Have 30ft Apron Including Stop Bar. Burke County- Winter Road 2. Beginning Approximatley 500ft West Of Us 25 Intersection At Paving Joint For a Distance Of 2.43 Miles And Ending At Storymill Road. Spot Level With 9.5mm Mix As Directed By Road Superintendent. Resurface Roadway With 160lbs/Sqyd Of 9.5 Mm Mix. Restripe Centerline And Edge Lines. Autumn Road Shall Have 30 Apron Including Stop Bar. All Driveways And Unpaved County Roads Shall Have Minimum 2 Ft Aprons. Average Width 21ft.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents