Similar Projects
Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pond and Drainage System Construction
Infrastructure
Results
$270,923 CJ est. value
De Pere, WI 54115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Crackfilling
Infrastructure
Post-Bid
De Pere, WI

2021 Road Improvement
Infrastructure
Results
Denmark, WI 54208

Last Updated 04/07/2023 02:50 AM
Project Title

Resurfacing 2-23 (Including Sewer and Water)

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54301   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,879,832 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sanitary Sewer (Gravity), Water Utilities, Aggregate, Construction, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, Street/Road Asphalt Milling, Traffic Control, Fire Hydrant, Excavation, Paving (Asphalt or Concrete), Miscellaneous, Utility Street Construction and Excavation, Sewer and Water Construction, Curbs, Concrete Repair Works Improvement Contract: "RESURFACING 2-23 (INCLUDING SEWER & WATER)" in accordance with the plans therefore, the City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2023 Edition, and the special provisions of this contract, all of which are on file in the City Clerk's/Treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. The work under this Contract includes construction of approximately 4,270 linear feet of 6" and 8" water main including service relays and transfers, and water main construction staking; installment of 1,300 linear feet of 8" and 12" sanitary sewer relay, 920 linear feet of CIPP lining, including sanitary sewer lateral reconnections, sanitary spot repairs, and sanitary sewer manhole construction and replacement; 1,200 linear feet of 8", 12", and 15" storm sewer construction including inlet leads, storm sewer laterals, storm sewer inlet construction, storm manhole removal, and storm manhole construction; 3,500 cubic yards of excavation below subgrade, 3,500 linear feet of curb and gutter, 3,500 tons of crushed aggregate base course, 5,460 tons of HMA pavement, 29,200 square yards of milling surface, 7,600 square feet of concrete sidewalk and driveway reconstruction; 500 square feet of cast iron curb ramp detectable warning field, construction staking, and 2,000 square yards restoration. 1. Section 62.15 regarding public works construction. 2. Section 779.15 regarding lien on contractors. 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents