Similar Projects
Sand Flats Gravel Parking Lot
Infrastructure
Bidding
Moab, UT 84532

11th Avenue Park Pavilion, Multi-Use Path and Signage
Infrastructure
Bidding
$250,000 est. value
Salt Lake City, UT 84103

Sunnyside 9-Line Trail Mathison Nature Preserve
Post-Bid
Less than $260,000 est. value
Salt Lake City, UT

Box Elder High New West Parking Lot
Post-Bid
Brigham City, UT 84302

Y--Provo Area Office Parking Lot Replacement
Results
$1,000,000 to $5,000,000 est. value
Provo, UT 84606

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

Lindon Community Center Southeast Entryway Upgrade
Infrastructure, Alteration
Bidding
Lindon, UT 84042

Century Elementary North Parking Lot Expansion
Post-Bid
Bear River City, UT 84302

Seal Coat Vernal, Ut Parking Lot
Results
Less than $25,000 est. value
Vernal, UT 84078

Construction Services for Kanab Center Ada Access Improvements
Post-Bid
Kanab, UT 84741

Layton Sidewalk Improvements
Results
Less than $100,000 est. value
Layton, UT 84040

Parking Lot G and F Rail Trail Connections Project 2021
Post-Bid
Park City, UT

Canyon Multi-Use Trails Project
Results
Ephraim, UT 84627

650 S Construction Trax Platform
Post-Bid
$1,750,000 to $2,000,000 est. value
Salt Lake City, UT

2020 Green River City Curb and Gutter and Sidewalk Project
Results
Green River, UT

Last Updated 02/04/2022 02:51 PM
Project Title

FG Power Plant Parking Lot Retaining Wall

Physical Address View project details and contacts
City, State (County) Dutch John, UT   (Daggett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Drainage and erosion problem in the power plant parking area. The section of riverbank of concern is located below Flaming Gorge Dam on the east side of the river a short distance downstream of the 66-inch hollow-jet valves. This area has seen significant erosion over the years primarily due to operation of the hollow-jet valves and runoff from the employee parking space during significant rain events. The Contractor will comply with the attached State of Utah Department of Natural Resources Stream Alteration Permit 20-41-01SA Dated 9 June 2020 when filling the rock void. To mitigate this issue Reclamation requires installation of a 3’ reinforced concrete wall with a 3’ chain link fence to include barbed wire. In addition, Reclamation needs7 a rock void filled. Flaming Gorge is located approximately 40 miles North East of Vernal, Utah.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents