Similar Projects
Last Updated | 06/28/2023 11:05 AM |
Project Title | Recreation Center Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Wheat Ridge, CO 80033 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $924,527 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000316064 The City of Wheat Ridge is seeking proposals from qualified contractors to remove the existing roofing system and replace it with a new 60 mil TPO roofing system. The property, located at 4005 Kipling St. Wheat Ridge, CO 80033, is an existing muti-story occupied recreation center with approximately 47,500 sf of roof areas. The building was originally constructed in 2001 and the current roofing system is the original system. - Bid Bond 5 % - Performance Bond 100 % Anticipated Start Date: August 2023 Buyer's Requirements General Requirements - Insurance Required Award Requirements - All or None Award Question Acceptance Deadline - 05/12/2023 06:00 PM EDT Questions are submitted online - Yes Contact Information Whitney Mugford-Smith 3032352811 wmsmith@ci.wheatridge.co.us The actual services to be performed will be determined by the City, to include but not limited to the following areas: Provide all labor, materials, and equipment to complete the scope of work described herein. Mobilize and maintain safe access to the facilities throughout the entire project. Remove existing ballasted EPDM roof system, comprised of (1)layer drywall substate board, (1) layer poly sheet vapor barrier, (2) layers of 2 polyiso insulation, all loose laid to steel deck Dispose of properly offsite Leave in place rigid flute fill insulation used as sound attenuation in perforated deck, replace as needed for wet or missing pieces. Inspect steel decking to determine if repair or replacement is necessary, confirm with the city, will be a per sq ft line item add. Remove and replace existing parapet coping cap, 24 ga steel prefinished, to match existing Install (1) layer of Vapair Seal MD vapor barrier direct to steel decking, turn up walls, penetrations. a minimum of 2 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |