Similar Projects
Canterbury Drive/Elm Ridge Drive/Wood Drive/Woodland Drive - Willow Creek Subdivision, Phase II - Village Of Northbrook
Alteration
Conception
$4,375,701 est. value
Northbrook, IL

Gray Farm Marsh - Storm Sewer Outlet Redesign
Infrastructure
Design
$550,000 est. value
Schaumburg, IL 60194

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Storm Sewer Improvements
Post-Bid
$1,000,000 to $5,000,000 est. value
Flossmoor, IL 60422

Replacement of 650 Ft. of Bikepath, Installation of Storm Sewer
Results
Bartlett, IL 60103

Brown Park Stormwater Improvements
Results
Less than $48,000 est. value
Orland Park, IL 60462

Palatine Strip Mall Facade & Sewer Improvements
Renovation, Alteration
Pending Verification
Palatine, IL 60067

Willow Walk Subdivision Drainage Improvements
Post-Bid
Arlington Heights, IL

Weathersfield Way Relief Sewer and Rear Yard Improvements
Results
Schaumburg, IL

2021 Sewer Repairs
Infrastructure
Post-Bid
Chicago Heights, IL

2021 Storm Sewer Improvement
Results
Less than $133,355 est. value
Rolling Meadows, IL

Playfield Subdivision Phase 3 Storm Sewer Rehabilitation
Alteration
Post-Bid
Crestwood, IL 60803

Schubert & Lakewood Sewer Improvement
Results
Chicago, IL 60632

Village of Flossmoor Storm Sewer Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Flossmoor, IL

Construction of a Parking Lot, Storm Sewer Removal and Replacement of Existing Frame
Results
IL

Reported 07/14/2022 08:17 AM
Project Title

Green Alley Project - Village of Niles

Physical Address View project details and contacts
City, State (County) Niles, IL 60714   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2026
Bids Due View project details and contacts
Estimated Value Less than $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Niles, Illinois. Conceptual plans call for site work for a water / sewer project. The Green Alley location is west of Milwaukee adjacent to the Dutchman's Point Neighborhood. The project will reduce flooding and increase sustainability in Niles, and will specifically reduce runoff to an area of Dutchman's point where over 10 homes flood. This Project is include in the Village of Niles's 2023 - 2028 CIP and funding is allotted for FY 25. As of July 13,2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents