Similar Projects
Fortress Self-Storage
New Construction
Conception
Tooele, UT

Lakeview Business Park
New Construction
Conception
$1,500,000,000 est. value
Tooele, UT

Sun River Commons
New Construction
Design
Saint George, UT

Morrell Warehouse
New Construction - 14,308 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Valley City, UT

Building 1954, HAFB Museum Warehouse and Equipment Building
New Construction
Bidding
Clearfield, UT

Construction of the Maeser Water Shop
Bidding
Vernal, UT 84078

Purchase City property in the vicinity of 800 West Coal Creek Road
Post-Bid
Cedar, UT

Purchase City property
Post-Bid
Cedar, UT

Panguitch Road Shed Project
Results
Panguitch, UT

Custom Built Sheds With Installation - Contract
Results
UT

National Wood Products Expansion
Addition - 11,051 SF
Construction
Salt Lake City, UT 84115

Alexander's Print Advantage
Addition - 23,000 SF
Construction
Lindon, UT 84042

Camp Oakley Barn and Accessory Buildings
New Construction - 9,580 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Oakley, UT 84036

Mountain Life Church
New Construction, Addition - 37,670 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Park City, UT 84098

Factory Powersports
New Construction
Conception
Saint George, UT

Last Updated 10/16/2019 11:45 AM
Project Title

Doterra Distribution Center

Physical Address View project details and contacts
City, State (County) Lindon, UT 84042   (Utah County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced August 2018, Construction Completion Expected December 2019
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1 Warehouse/Storage, 270,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents