Similar Projects
Last Updated | 03/13/2023 08:02 PM |
Project Title | Hearn Road (Callicoatte Road to Dead End) Bond 2020 |
Physical Address | View project details and contacts |
City, State (County) | Corpus Christi, TX 78410 (Nueces County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,411,934 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall fully reconstruct approximately 2,700 LF of 40' B-B HMAC roadway, and related improvements such as curb and gutter, curb ramps, sidewalks, storm water, water, wastewater, and incidentals. The Contractor shall perform all utility improvements, upgrades, traffic control, and project sequencing thru related coordination with the City and private utility owners. This project also includes related coordination with private utility owners and with the city on existing utilities, traffic control, and project sequencing. It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and or Bids Amounts. Sealed Bids may be submitted either (i) electronically Bidders are advised to refer to Request for Bids Section 5 of the bidding documents for a list of required bid submittals. Failure to submit or upload all required documents may result in an irregular or non-responsive bid submittal. The deadline to ask questions is November 30, 2022 by 4:00 PM The work is to be substantially completed within 300 days. ; Final completion- 330 days 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15% MSA No. 3399, |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |