Similar Projects
L-28 Power Conduit
Infrastructure
Sub-Bidding
$300,000 CJ est. value
West Palm Beach, FL 33401

Town-Wide Overhead Utility Undergrounding Project - Phase 6, South And North (Formerly Phase 5)
Alteration
Post-Bid
Palm Beach, FL

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Lift Station Arc Flash Mitigation (Phase I)
Alteration
Results
West Palm Beach, FL

Electrician Services
Term Contract
Results
Loxahatchee, FL

Tropical and Coconut Pump Station Generator
Alteration
Post-Bid
Ocean Ridge, FL

Maintenance and Repair Services for Industrial Electric Motors and Pumps
Term Contract
Results
FL

District 7 (Fleet) - Generator Replacement
Alteration
Post-Bid
Boca Raton, FL 33498

EOC, OPS - Lighting Replacement
Alteration
Results
West Palm Beach, FL 33415

S-2, S-3, S-4, S-7, and S-8 Monitoring Panels Replacement
Alteration
Post-Bid
West Palm Beach, FL 33411

Supply And Delivery Of A Standby Power Generator
Addition
Results
$525,000 est. value
Wellington, FL

Central Plant Chiller Removal and Replacement work at Main Detention Center
Renovation
Post-Bid
West Palm Beach, FL 33406

Wellhead and Electrical Improvements for Surficial Aquifer (SA) Wells 8A-12A
Infrastructure, Alteration
Results
$2,023,000 est. value
Jupiter, FL 33458

DB Upgrade CLC Hospice Outbuildings Transformer
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
West Palm Beach, FL 33410

Lift Station 160 and 296 Emergency Generator and Automatic Transfer Switch Installations
Alteration
Results
$110,000 est. value
Jupiter, FL 33458

Last Updated 06/09/2023 05:08 PM
Project Title

Switchboard Replacement at Timber Trace Es & Cypress Trails Es

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL 33410   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a design-build project to provide a full turn-key replacement of the main electrical switchboard. The Scope of Work includes, but is not limited to design, engineering, permitting, contractor labor, tools, equipment, materials, and electrical equipment to perform ALL work necessary to replace the main switchboard with a new switchboard. The Contractor shall obtain the services of a Florida Registered Professional Engineer to provide assessment of existing conditions and to provide engineering plans and specifications for the replacement of the Main Switchboard. This is a complete "turn-key" project. The contractor is required to provide all equipment, labor, demolition, materials, programming, rigging, concrete and masonry work, electrical work, door/framework, commissioning, etc. that is required to replace the main electrical switchboard. Contract time: It is anticipated that purchase and delivery of the new equipment will be a lengthy process. As such, Substantial Completion of the project shall be within 455 calendar days after the contractor receives the Notice to Proceed. This allows 105 days for design and permitting, 320 days for equipment purchase and delivery, and 30 days for installation. Question Deadline 05/12/2023 at 2:00 PM ET ESTABLISHED PROJECT BUDGET FOR CONSTRUCTION: $2,000,000 ($1,000,000 each) Substantial Completion of the project shall be within 455 calendar days, Final Completion shall be 75 days after Substantial Completion.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents