Similar Projects
Last Updated | 08/21/2020 12:51 PM |
Project Title | Parking Structures 2020 Maintenance Repair |
Physical Address | View project details and contacts |
City, State (County) | Bloomington, IL 61701 (McLean County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Parking Garage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Market Street Garage - three remove loose overhead concrete, six tee flange strengthening, 521 SF tee stem repair, 600 SF tee flange repair, 251 SF tee flange repair shear connector, 245 LF tee stem repair FRP horizontal wrap, 320 LF tee stem repair FRP vertical wrap, tee stem strengthening, 305 LF repair crack/joint sealant. Market Street Bid Alternate 1 - floor repair, beam repair, tee flange repair, expansion joint, seal cracks and joints, repair crack/joint sealant, cove sealant, shear transfer devices. Market Street Bid Alternate 2 - beam repair, column repair, wall repair, tee flange repair, traffic topping-repair at joint, floor drain replacement, pipe and hangers, pavement markings. Arena Garage - 290 SF partial depth floor repair, 50 LF curbs floor repair, 35 grout pocket wall repair, 2 SF tee flange repair, 400 LF seal cracks and joints, 250 LF repair crack/joint sealant, 50 LF cove sealant, three pavement markings. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |