Project Title | Replacement of the Main Street Bridge over Contoocook River |
Physical Address | View project details and contacts |
City, State (County) | Peterborough, NH (Hillsborough County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,900,000 to $5,400,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of: The Main Street Bridge replacement project (NHDOT No. 14933; Federal No. X-A002(107)) consists of replacing the 75` clear span stone-faced concrete rigid frame bridge. The work includes replacing the structure with a 47`-7" wide, 75` clear span rigid frame, replacing the northwest wingwall, and reconstructing a limited length of the retaining walls at the three remaining corners. The masonry facing of the existing bridge shall be removed and installed on the proposed bridge. A historic canal approximately 40` west of the bridge shall be sliplined with a 5` diameter polyethylene pipe, connected to a 10` diameter drainage manhole, and daylighted near the river with a 5` diameter polyethylene pipe. Roadway approach work will be limited to approximately 200` west and 50` east of the bridge. The roadway approach work to the east shall tie-in to the US Route 202 reconstruction work. The anticipated project schedule is to start construction on or about February 1, 2020 and complete construction on or about June 1, 2022. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |