Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Pedestrian Ramp Replacement
Infrastructure
Bidding
Deer Park, WA

Harney Elementary School Parking Lot Expansion
Alteration
Bidding
Vancouver, WA 98687

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,850,000,000 est. value
Tacoma, WA 98405

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Mission Ridge Resort Expansion
New Construction
Pending Verification
Wenatchee, WA 98801

2nd Street Water and Roadway Improvements
Alteration
Bidding
$1,150,000 to $1,200,000 est. value
North Bend, WA

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Bremerton Station
Renovation, Infrastructure
Pending Verification
Bremerton, WA 98310

Last Updated 02/22/2022 11:57 AM
Project Title

Burns Pathway Phases 1-3 and North Road 93-Powerline Pathway (Phase 4)

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $467,197
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Burns Road Pathway – Phase 1 - Phase 4 project). This project involves as a base bid the construction of an asphalt pathway along the South side of Burns Road between Broadmoor Blvd (aka Road 100) and Road 84. Additive bid schedules have been included to extend the pathway between Road 84 and Road 68 (Additive Schedule A), and along the Road 93 alignment in the powerline easement between Burns Road and Wellington Drive (Additive Schedule B)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents