Similar Projects
SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Compact Low Speed Mixer Water Pollution Control
Renovation
Results
$25,000 est. value
Topeka, KS 66616

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

Water Treatment West Plant Basin Rehabilitation
Renovation
Results
Topeka, KS 66606

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Construction Manager At Risk - Project Approach
Renovation
Post-Bid
$1,625,000 est. value
Topeka, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Wastewater Treatment Plant Aeration Improvements
Renovation
Bidding
$400,000 est. value
Garden City, KS 67846

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Wastewater Treatment Plant Improvement Project Packages
Renovation
Post-Bid
$30,000,000 est. value
Salina, KS 67401

Wastewater Treatment Plant Aeration Improvements
Renovation
Bidding
$400,000 est. value
Garden City, KS

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Reported 07/13/2022 01:20 PM
Project Title

Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2023
Bids Due View project details and contacts
Estimated Value $3,598,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the design and installation of all equipment and appurtenances required to update the Thickening Process at the Oakland Wastewater Treatment Plant. The process thickens the waste activated sludge and then is pumped to the Anaerobic Digestion process. This is a key component in ensuring that the biological requirement limits of the Plant effluent discharge continue to be met. The existing system is approximately 50 years old. Due to the antiquated system both in age and technology, it is becoming more costly to continue to perform effective maintenance to ensure the most efficient process is met. As of July 12, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents