Similar Projects
Ridgewood Farms
New Construction, Infrastructure
Conception
$47,700,000 CJ est. value
Winterville, NC 28590

SCADA Building for the Old Tar Gate Station Site
New Construction, Infrastructure
Design
$300,000 CJ est. value
Greenville, NC 27858

Gymnasium in the Alice F. Keene District Park - Pitt County
Addition, Infrastructure
Design
$3,700,000 CJ est. value
Greenville, NC 27858

Pitt County Government New Sheriffs Office Building
New Construction, Infrastructure - 35,041 SF
Bidding
$500,000 CJ est. value
Greenville, NC 27858

Milling, Paving Type of Work in Pitt County
Infrastructure
Bidding
$5,000,000 CJ est. value
Winterville, NC 28590

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bridge Number 87 Water Main Relocation
Infrastructure
Post-Bid
NC

Water Main Rehabilitation Program
Infrastructure
Results
$762,423 est. value
Greenville, NC 27834

Main Campus - Mcginnis to Wright - Chilled Water Infrastructure Extension
Infrastructure
Results
Greenville, NC

Site Work and Renovations for the Pitt County Animal Shelter
Renovation
Construction
Greenville, NC 27858

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

Wastewater Tank - Greenville Utilities Commission
Demolition, New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Greenville, NC 27858

College Hill Drive Steam Replacement Phase 3
Infrastructure
Bidding
$2,000,000 CJ est. value
Greenville, NC 27858

Greenville Aquatics and Fitness Center Family Restroom Addition
Infrastructure
Post-Bid
Greenville, NC 27834

2019 Water Line Replacement West Side Water Replacement
Infrastructure
Results
Fountain, NC 27829

Last Updated 11/04/2022 02:03 PM
Project Title

RFQ Engineering - Greene Street Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2020
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Comprehensive engineering services are requested for the preparation of engineering documentation and the design and preparation of plans and specifications for the purpose of bidding and constructing wastewater system improvements for the Greenville Utilities Commission. The anticipated project includes an approximately 0.25 MGD pump station and approximately 6,000 LF of force main. The estimated start date for services on this project is October 2019 and the estimated completion date for construction is October 2021. Those firms which meet the requirements described in this announcement and wish to be considered must submit six (6) completed copies of Standard Form (SF) 330, Parts I & II. Include an SF 330 Part II for each consultant listed in Block C of the firms submittal. Consultant evaluation criteria will include: (1) Recent specialized experience in wastewater pump station and force main design and construction. Do not list more than a total of five (5) projects in Section F. Indicate which staff and consultants from the proposed team participated in the design of each project in Section G. (2) Professional qualifications of the staff to be assigned to this project. (3) Capacity of the firm to accomplish the work within the required timeframe. Indicate in Section H the workload and availability of the project team, including any consultants, for the specified contract performance period. List work currently being performed for Federal, State, and Local government agencies. (4) Past performance on contracts with government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Indicate by briefly describing in Section H, internal quality assurance/quality control procedures and cost control procedures and indicate effectiveness by listing final A/E estimate, construction award amount and percentage differential, and construction change orders for up to five recent projects. List recent awards, commendations and other performance valuations (do not submit copies). Additional information requested of applying firms: Discuss why, based on the selection criteria, the firm is especially qualified to perform this project; for firms applying with multiple offices, indicate the office which completed each of the projects listed in Section F and list which office is under contract for any contracts currently being performed; use Section H to provide any additional information desired. It is requested that interested firms list prior names the firm has used in the past three years, including the parent company, branch offices, affiliates, and subsidiaries. Inquiries concerning this request should be directed to Tyler Haislip, Water Resources Engineer, at (252) 551-1494 or haislitj@guc.com. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents