Similar Projects
Lowell Preserve Playground
New Construction
Bidding
Less than $50,000 est. value
Windham, ME 04062

Dougherty Field Playground
New Construction
Bidding
$220,000 est. value
Portland, ME 04102

York High School Tennis Courts Demolition and Reconstruction
Post-Bid
York, ME

Skate Park Expansion
Renovation
Post-Bid
Old Orchard Beach, ME

Installation of a Futsal Court
Results
Less than $110,000 est. value
Portland, ME

Community Park - Phase 2
Results
Windham, ME 04062

Penobscot Avenue Street Lights and Veteran's Park Improvements
Renovation
Post-Bid
Millinocket, ME 04462

Tennis Court Repairs
Results
Lewiston, ME 04240

Restoration of Atlantic Avenue Park
Results
Old Orchard Beach, ME

Construction of Concrete Skatepark
New Construction - 10,000 SF
Results
South Portland, ME

Hudson Bus Site Playing Field
New Construction
Results
Lewiston, ME

Skatepark Specialty Construction
Results
Kennebunk, ME

Talbot School Basketball Court Reconstruction and Culvert Replacement Project
Renovation, Infrastructure
Results
Less than $134,000 est. value
Portland, ME

2021 Futsal Court Project
New Construction
Results
$70,000 est. value
Auburn, ME

Fuller Field Bleacher Repairs and Upgrades
Renovation
Results
Augusta, ME 04330

Last Updated 01/24/2022 09:27 AM
Project Title

Forbes Pocket Park

Physical Address View project details and contacts
City, State (County) Wells, ME 04090   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A design and installation of paths, gardens, and other possible amenities at the Forbes Pocket Park located at the northeast corner of Mile Rd and Route 1 in Wells, Maine. The flagpole, the stonework patio surrounding the flagpole, and the stone wall are remaining as installed. The pathway leading from the patio to Mile Rd needs to be removed and replaced with stairs and a retaining wall. The pathway leading from the patio to Route 1 currently includes two colors of pavers. This pathway will need to be updated to include a consistent color or pattern throughout. The location may also be changed if desired in the design. The remaining space is open for design interpretations but should include low maintenance, native plantings and should provide safe passage for pedestrians from the sidewalks along both Mile Rd and Route 1. Fencing has already been purchased for the edges of the property and is scheduled for installation in the spring of 2022. Irrigation has already been installed on the property

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents