Similar Projects
Last Updated | 04/16/2023 08:01 AM |
Project Title | Hangar 661 Concrete Floor Repair and Replacement Sawyer International Airport |
Physical Address | View project details and contacts |
City, State (County) | Gwinn, MI 49841 (Marquette County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $41,800 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The County requests quotes to repair/replace multiple sections of the concrete hangar floor in Hangar 661. See attachment 1 for approximate locations. The depth of the concrete in these sections must be replaced full-depth. All replacement concrete needs to be doweled/pinned into the existing concrete and re-barred. See attachment 2 for installation requirements. The strength of the concrete must be at minimum 5000psi. March 17, 2023 Questions Due from Bidders |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |