Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station #43
New Construction
Design
$5,000,000 est. value
Fort Worth, TX

Emergency Services Station with Living Quarters
New Construction - 10,000 SF
Design
Hudson Oaks, TX 76087

Fire Station Gear Locker Improvements
Renovation, Term Contract
Bidding
$426,000 est. value
Corpus Christi, TX 78408

Architectural Services for Fire Station 5 Additions and Renovations
Renovation, Addition
Bidding
$8,900,000 est. value
Plano, TX 75093

Fire Station No. 19 Renovation Project
Renovation
Sub-Bidding
Houston, TX 77282

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

Temporary Buildings and Dome Structures
New Construction - 7,700 SF
Results
$145,196 est. value
Dallas, TX 75230

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

New EMS Station 97
New Construction - 4,000 SF
Construction
Humble, TX 77346

Shari D. Coleman Animal Shelter & Adoption Center And Fire Station #4
New Construction - 31,200 SF
Construction
Less than $15,400,000 est. value
Pearland, TX

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Last Updated 05/13/2022 12:28 PM
Project Title

Fire Station 8

Physical Address View project details and contacts
City, State (County) Conroe, TX 77301   (Montgomery County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $7,560,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design, construct, equip and occupy a new fire station on the east side of the city by March 2023. This process will take approximately 24 to design and order the necessary equipment needed for the fire station and the new truck.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents