Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Sand Creek Road Extension
Infrastructure
Bidding
$7,300,000 CJ est. value
Brentwood, CA 94513

Sand Creek Road Extension
Infrastructure
Bidding
$7,300,000 CJ est. value
Brentwood, CA 94513

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

Horticulture Paving & Drainage
Infrastructure
Bidding
$500,000 CJ est. value
Pleasant Hill, CA 94523

Last Updated 02/20/2023 01:15 PM
Project Title

L Street Improvements - City of Antioch

Physical Address View project details and contacts
City, State (County) Antioch, CA 94509   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $12,171,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of modifying and widening portions of the roadway, constructing new concrete curb, gutter, sidewalks and curb cuts, installing landscaping and decorative hardscape, improve bicycle access and upgrading signage and striping throughout the project. Project is included in the City of Antioch's FY 2022-2027 CIP. As of February 20, 2023, information regarding a design team and a general contractor is not available. Right-of-way is anticipated in 2023/2024 and construction is anticipated in 2022/2023. and 2024/2025.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents