Similar Projects
King County Job Order Contract
Term Contract
Design
Seattle, WA 98164

Small Work Roster
Term Contract
Design
$300,000 CJ est. value
Burien, WA 98166

Generator Parts, Inspections, Testing and Repair
Term Contract
Sub-Bidding
Kent, WA 98032

Emerytop 400 Concrete
Term Contract
Sub-Bidding
$20,000 CJ est. value
Kent, WA 98032

Acceptance of Non Hazardous Fill (Pool Bid)
Alteration
Post-Bid
WA

Facilities Landscape Maintenance
Infrastructure
Post-Bid
$45,000 est. value
Sammamish, WA

Temporary Scaffolding Services
Term Contract
Results
WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Small Works Roster
Term Contract
Design
$350,000 CJ est. value
Seattle, WA 98164

2023-2025 Emergency Field Services
Term Contract
Sub-Bidding
$450,000 CJ est. value
Federal Way, WA 98003

Parks Landscape Maintenance
Alteration
Post-Bid
$225,000 est. value
Sammamish, WA

Depleted Uranium
Term Contract
Sub-Bidding
Bellevue, WA 98004

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Landscape Maintenance
Term Contract
Sub-Bidding
$471,208 CJ est. value
Auburn, WA 98002

Janitorial Services Various Sites - West
Alteration
Post-Bid
Bellevue, WA

Last Updated 02/03/2023 02:11 PM
Project Title

Millwork and Casework Portwide On-Call 2023

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 01/26/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes interior and exterior millwork and Casework with other work-related assemblies involving lumber, plywood, plastic laminates, molding, paneling, casework, shelving, benches, handrail, paint, stains, cabinet doors and hardware. Projects may be part of facility restoration, remodel, reconfiguration, new work, repairs, and installations. This contract does not include work for asbestos containing materials (ACM). Recycling of waste from the projects and use of recycled products is encouraged. The contract will be awarded for an estimated amount not to exceed $300,000.00, which includes Washington State Sales Tax. The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 - Bid Form. The contract will last one (1) year, 365 calendar days, from the official contract award date, which is the date the Port of Seattle signs the Agreement, or until the contract amount is depleted, whichever comes first. This contract contains an option to extend the contract time up to 12 months beyond the original contract completion date. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. A bid bond is not required. Labor and Industries require a "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid". The expense of such is the responsibility of the Contractor. If the Port exercises its option to extend the contract an additional year, then new Intents and Affidavits will be required for the additional contract year at the prevailing wage rates published at that time. The contract rates will be amended to reflect the changes in prevailing wage, if any. A portion of this Contract requires work to be performed within an area of the Airport controlled for security reasons. All Contractor personnel working in restricted areas (including AOA, Secured, SIDA and Sterile areas) on this project shall have Port of Seattle airport-issued identification / access badges in accordance with Title 49, Code of Federal Regulations (CFR), Part 1540/1542 and the Airport Security Plan. Bidders should consider the impact of acquiring badges when preparing their bids. Question Cut-off Date: Feb 1, 2023, 2:00:00 PM

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents