Similar Projects
Water Sewer Repair
Bidding
Winthrop, MA

Water and Sewer On-Call Repair Contract
Bidding
$200,000 est. value
Winthrop, MA

Storm and Sanitary Line Replacement at Bellflower Development - General Bid
Post-Bid
Less than $1,248,641 est. value
Dorchester, MA

Broadway Water and Sewer Improvements
Post-Bid
Chelsea, MA

Dorchester Interceptor Sewer
Results
Less than $6,000,000 est. value
Mattapan, MA

Chelsea High School Sewer Service
Results
Chelsea, MA

Clean/Television Inspection of Sewers Citywide
Post-Bid
Less than $550,000 est. value
Boston, MA

CCTV Sewer Inspections
Results
Chelsea, MA

Emergency Repairs to Sewers and Drains Citywide
Post-Bid
Less than $1,500,000 est. value
Roxbury, MA 02119

Reconstruction of Sewerage Works Citywide
Results
Less than $1,150,000 est. value
Boston, MA

Reconstruction of Sewerage Works Citywide
Post-Bid
$1,500,000 est. value
Boston, MA 02119

Emergency Repairs to Sewers and Storm Drains Citywide
Results
Less than $1,500,000 est. value
Boston, MA

Repair Broken Sewer Main, Boston Public Library Central Branch
Post-Bid
$21,000 est. value
Boston, MA 02116

Prescott Avenue and Cross Country Sewer Reconstruction
Results
Less than $80,000 est. value
Chelsea, MA

Installation of New PVC Sanitary Drain System at Buildings 3 and 4 at Archdale
Post-Bid
$142,884 est. value
Boston, MA 02131

Reported 06/19/2020 12:00 AM
Project Title

Construction of Approximately 1,100 LF of SDR 35 Polyvinyl Chloride (PVC) Sewer Mains

Physical Address View project details and contacts
City, State (County) Winthrop, MA   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $525,000
Plans Available from Engineer - 06/03/20
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 1,100 LF of SDR 35 polyvinyl chloride (PVC) sewer mains, new sewer manholes, installation and maintenance of temporary sewer bypass pumping system, new service laterals installed to the property line, pavement reclaim and full-width pavement restoration within the project area; and all materials and equipment, services and construction inherent to the Work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents