Similar Projects
2020 Roadway and Drainage Improvement Program
Bidding
Marlboro, NJ

Mercer Lake Bank Restoration
Bidding
NJ

Stone Point Park Drainage Improvements
Post-Bid
Old Tappan, NJ 07675

Furnish and Deliver Concrete Pipes
Post-Bid
Freehold, NJ 07728

Church Street Drainage Improvements
Results
$60,201 est. value
Boonton, NJ 07005

Culvert Wall Restoration on North Park Drive in the Township of Cherry Hill
Results
Cherry Hill, NJ

FY 2015 Discretionary Aid, Drainage Improvements to Bell Road
Post-Bid
Mount Ephraim, NJ 08059

Curtis Avenue Drainage Improvements
Results
Point Pleasant Beach, NJ 08742

2020 Citywide Drainage Improvements
Post-Bid
Vineland, NJ 08360

Camp Evans Drainage Improvements
Results
Wall, NJ 07719

Parking Lot and Drainage Improvements at Lincoln Park Middle School
Post-Bid
$351,488 est. value
Lincoln Park, NJ 07035

Beach Nourishment, Cape May Inlet to Lower Township, Cape May, NJ
Results
$10,000,000 to $20,000,000 est. value
Cape May, NJ 08204

Worthington Avenue Outfall Improvements
Post-Bid
Spring Lake, NJ 07762

North Chester Avenue Sump Header Improvement
Results
Riverside, NJ 08075

Absecon Inlet to Great Egg Harbor Inlet, Absecon Island, Atlantic County, NJ.
Post-Bid
$25,000,000 to $100,000,000 est. value
Absecon, NJ

Last Updated 02/23/2021 06:59 AM
Project Title

Channel Reconstruction at Short Hills Garden Apartments

Physical Address View project details and contacts
City, State (County) Millburn, NJ   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to reconstruction of approximately 384 linear feet of existing channel and flume extents with a bioengineered channel including joint plantings, tree removals, approximately 270 linear feet of new modular block retaining wall, riprap channel and slope protection, a new 42" reinforced concrete headwall, a new 66" reinforced concrete wingwall, and concrete and cobble flume restoration with cast in place concrete knee wall.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents