Similar Projects
Repair HVAC/Electrical Infrastructure - B317
Design
$500,000 to $1,000,000 est. value
Niagara Falls, NY

Repair HVAC/Electrical Infrastructure Building 317
Infrastructure
Design
$500,000 to $1,000,000 est. value
Niagara Falls, NY 14304

Heat Treatment Services
Alteration
Bidding
Lewiston, NY 14092

1311 BSNY Chiller Replacement (NIA)
Post-Bid
Lewiston, NY 14092

HVAC-R and Commercial Kitchen Appliance Maintenance and Repairs
Alteration
Post-Bid
Lockport, NY 14094

Lockport City School District Capital Outlay Project 2016-2017
Results
Lockport, NY 14094

Niagara Wheatfield 2016-17 CIP Phase IV Signage Project
Renovation
Results
Sanborn, NY 14132

Lewiston-Porter CSD 2020 Capital Improvements Phase I
Renovation
Construction
$25,000 to $3,400,000 est. value
Youngstown, NY 14174

Lewiston-Porter CSD - 2020 CIP Phase 2
Renovation
Construction
$27,000 to $4,596,000 est. value
Youngstown, NY 14174

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Barker CSD 2018 and 2020 Capital Outlay Project
Renovation
Results
Barker, NY 14012

Newfane CSD 2020 Capital Improvements
New Construction, Renovation
Construction
$23,000,000 est. value
Burt, Newfane, NY 14108

HVAC
Alteration
Post-Bid

Niagara Falls CSD Smart Schools Phase 2
Alteration
Results
Niagara Falls, NY 14304

2022-2027 Community HVAC and Hot Water Services
Term Contract
Post-Bid

Last Updated 08/04/2022 07:05 AM
Project Title

Replace Air Conditioning System on a Dectron Pool Heater

Physical Address View project details and contacts
City, State (County) Lockport, NY 14094   (Niagara County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Convert one Dectron pool heater MOD#RSH-120-9, SER# A2008040019 to 407C refrigerent. Contractor is responsable for evacuating and cleaning the system. Contractor is responsable for all replaement parts and materials needed to convert the system to 407C refrigerent. Contractor is responsable for removal and disposal of any old parts, materials, ond refrigerent and any oils. Contractor is also responsable for any ladders, lifting devices or any equipment to axcess the roof where the unit is. The list below identifies specifications but not limmited to other recommondations from the manufactor needed to make the conversion. o Leak check with nitrogen and repair o replace all Schrader's and caps o remove refrigerant oil and replace o remove filter drier and replace o remove high pressure switch and replace o remove relief valve and replace o pressure test with nitrogen o evacuate to 250 microns o charge with virgin 407C o adjust head pressure switch o observe operation BRS SVC Labor-HVAC Tech (Regular) BRS SVC Labor-HVAC Tech (Regular) Misc Item - Service Parts filter drier Misc Item - Service Parts hardware PPE Misc Item - Service Parts 440 # relief valve Misc Item - Service Parts head pressure control adj Misc Item - Service Parts isolation valves General parts needed, NC4314-66 OIL ECT POE GALLON NC4383-07 VACUUM PUMP OIL 1GAL Nitrogen Gas Refill - 40 Cubic Feet (use NITROGEN_60CF for larger tanks) P-0570S CAP FLARE 1/4" W/INS (10 PK) P02-0290 VALVE CORE REFRIGERANT R-407C Refrigerant / LB Contractor is responsable to ensure unit is in working order as per manufactors specifications. General Requirements - Insurance Required - Local Service Required - Training Required - Contractors License Required - Onsite Maintenance Required - Warranty Information Required - Installation Required - Prevailing Wage Required - Certified Payroll - Material Safety Data Sheets Required Delivery Point 250 Lincoln Ave, Lockport NY 14094 Questions are submitted online No PLEASE NOTE: No bidding documents for project. Everything is done via site visits.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents