Similar Projects
Last Updated | 08/04/2022 07:05 AM |
Project Title | Replace Air Conditioning System on a Dectron Pool Heater |
Physical Address | View project details and contacts |
City, State (County) | Lockport, NY 14094 (Niagara County) |
Category(s) | Education, Single Trades |
Sub-Category(s) | HVAC, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $25,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Convert one Dectron pool heater MOD#RSH-120-9, SER# A2008040019 to 407C refrigerent. Contractor is responsable for evacuating and cleaning the system. Contractor is responsable for all replaement parts and materials needed to convert the system to 407C refrigerent. Contractor is responsable for removal and disposal of any old parts, materials, ond refrigerent and any oils. Contractor is also responsable for any ladders, lifting devices or any equipment to axcess the roof where the unit is. The list below identifies specifications but not limmited to other recommondations from the manufactor needed to make the conversion. o Leak check with nitrogen and repair o replace all Schrader's and caps o remove refrigerant oil and replace o remove filter drier and replace o remove high pressure switch and replace o remove relief valve and replace o pressure test with nitrogen o evacuate to 250 microns o charge with virgin 407C o adjust head pressure switch o observe operation BRS SVC Labor-HVAC Tech (Regular) BRS SVC Labor-HVAC Tech (Regular) Misc Item - Service Parts filter drier Misc Item - Service Parts hardware PPE Misc Item - Service Parts 440 # relief valve Misc Item - Service Parts head pressure control adj Misc Item - Service Parts isolation valves General parts needed, NC4314-66 OIL ECT POE GALLON NC4383-07 VACUUM PUMP OIL 1GAL Nitrogen Gas Refill - 40 Cubic Feet (use NITROGEN_60CF for larger tanks) P-0570S CAP FLARE 1/4" W/INS (10 PK) P02-0290 VALVE CORE REFRIGERANT R-407C Refrigerant / LB Contractor is responsable to ensure unit is in working order as per manufactors specifications. General Requirements - Insurance Required - Local Service Required - Training Required - Contractors License Required - Onsite Maintenance Required - Warranty Information Required - Installation Required - Prevailing Wage Required - Certified Payroll - Material Safety Data Sheets Required Delivery Point 250 Lincoln Ave, Lockport NY 14094 Questions are submitted online No PLEASE NOTE: No bidding documents for project. Everything is done via site visits. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |