Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Bowden Point Road - Paving Project
Infrastructure
Bidding
$293,000 est. value
Prospect, ME 04981

Paving - Project 1 - Finish Paving the Nickerson Road and Campground Road
Post-Bid
Swanville, ME

Paving - Project 2 - Finish Paving the Webster Road
Post-Bid
Swanville, ME

On Call Milling Machines and Grinders
Results

Paving Project
Results
Belfast, ME

Highway Reconstruction - Searsport - Region 2
Infrastructure
Bidding
$15,795,000 CJ est. value
Belfast, ME 04915

Paving - Project 3 - Reclaiming and Base Coat Paving the Roberts Road
Post-Bid
Swanville, ME

On Call Maintenance Paving
Results

Add Shoulder Aggregate to Existing Shoulders
Infrastructure
Post-Bid

(LCP) Light Capital Paving
Results
Less than $1,249,000 est. value

2022 Road Paving
Infrastructure
Post-Bid
$200,000 est. value
Winterport, ME

(LCP) Light Capital Paving
Results
$1,730,000 est. value
Chelsea, Damariscotta, Jefferson, Liberty, Nobleboro, Palermo, Somerville, Waldoboro, Washington, Whitefield, ME

Paving the Swanville Transfer Station
Infrastructure
Post-Bid
$360,000 est. value
Monroe, ME 04951

(Lcp) Light Capital Paving
Results
Less than $1,499,000 est. value
Bremen, Bristol, Camden, Hope, Lincolnville, Searsmont, Thomaston, Union, Waldoboro, Warren, ME

Last Updated 07/21/2022 05:23 AM
Project Title

Paving and Reclaiming, Ditching, and Culvert Replacement - Prescott Hill Road, Rocky Road, and Saturday Cove Road

Physical Address View project details and contacts
City, State (County) Northport, ME   (Waldo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Paving Scope of Work Approximately 2.7 miles of paving to be done, broken down as follows: Prescott Hill Rd 1.3 miles 1.5" broken down as 0.5" shim laid first then 1" overlay of 9.5 mix on an average width of 20'. Add gravel to shoulders and driveways for an even transition after pavement is laid. Rocky Rd 1.1 miles 1.5" broken down as 0.5" shim laid first then 1" overlay of 9.5 mix on an average width of 20'. Add gravel to shoulders and driveways for an even transition after pavement is laid. Saturday Cove Rd 0.3 miles 1.5" broken down as 0.5" shim laid first then 1" overlay of 9.5 mix on an average width of 18'. Add gravel to shoulders and driveways for an even transition after pavement is laid. Paving Specifications 1. The Contractor shall compact all reclaimed material to 95% of its maximum dry density as determined by ASTM D-1557. The Contractor shall compact pavement to between 92 and 97% of its theoretical maximum density as determined by ASTM D 2041. 2. If Contractor is using a local mix, it shall be Maine Department of Transportation (MDOT) approved and meet the same standards as the MDOT "superpave" mixture. 3. The Contractor shall taper all driveway entrances to match the new pavement. 4. When new pavement stops on an existing paved road or intersection, the Contractor shall grind the old pavement for smooth transition from old to new. 5. The Contractor shall lay down hot mix asphalt only when the surface on which the material is to be placed is dry and when the atmospheric temperature is above 45 degrees and rising. 6. The Contractor shall ensure that all existing paved surfaces are thoroughly cleaned and dry and shall be tack coated prior to placement of the asphalt mixture. 7. The Contractor shall follow the MDOT methods and precautions. 8. Methods and practices such as excessive speed and disregard of mailboxes shall be controlled by the Contractor and will be monitored by the Town. 9. The Contractor shall supply its own safety control, traffic control, and proof of $400,000.00 Liability insurance. 10. The Contractor shall provide a list of all subcontractors to be used, if any. 11. The Town's Road Commissioner shall inspect and approve all work done before payment is made. 12. The Contractor is responsible for becoming familiar with the location and extent of work to be performed. 13. Contact the Road Commissioner, Amon Morse, with questions. 207-322-3331 14. Bids shall be broken down by tons of asphalt and price per ton Ditching & Culvert replacement Scope of Work Approximately 5769 feet (5769') of ditching on Prescott Hill Road and Rocky Road. Two (2) cross culverts to be replaced on Rocky Road. 1. 18"x40' 2. 18"x40' The Town will supply all culverts. Ditching & Culvert replacement Specifications: 1. The bottom of the ditch 30" deep if possible, compacted and rounded 2. Uniform grade to prevent ponding of water 3. Two foot (2') shoulder 4. 2 to 1 in-slope 5. 2 to 1 back-slope 6. Cross culverts must be down to allow for at least 2 feet of material on top. 7. Driveway culverts must be down to allow for at least 1 foot of material on top. 8. 2" minus used for back fill 9. 3' minimum of culvert for edge of travelled way to ditch 10. Cross culverts rocked in around inlet and outlet 11. Culverts to be plastic if possible

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents