Similar Projects
Water and Sewer Monitoring Services
Bidding
Fort Pierce, Jensen Beach, FL 34981

Essex Avenue, Steven Street and Scenic Way Watermain Extension Project
Bidding
$1,137,500 est. value
Citrus Hills, Hernando, FL 34442

BCJC Jail Water Meter Reconfiguration
Sub-Bidding
Fort Lauderdale, FL 33301

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Duckpond Water Main Improvements
Post-Bid
Gainesville, FL

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

1 Million and 3 Million Storage Tanks Pressure Sustaining Valve Replacement
Results
Less than $135,000 est. value
Boynton Beach, FL 33425

Duck Key Utility Relocations Horizontal Directional Borings - Harbour Drive and Seaview Drive
Bidding
Less than $1,271,633 est. value
Duck Key, FL

Comprehensive Wet Fire Sprinkler Systems / Fire Hydrant Services and Equipment
Term Contract
Post-Bid
New Port Richey, FL 34654

Horizontal Directional Drilling Services
Results
Daytona Beach, FL 32720

Fire Line Backflow Services
Term Contract
Bidding
FL

CIP Valve Replacement
Post-Bid
Palm Bay, FL

Underground Utility Construction and Emergency Services
Term Contract
Results
Fort Myers Beach, FL 33931

Oxford Drive Water Main and Drainage Improvements
Bidding
Bradenton, FL 34205

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

Last Updated 03/19/2021 01:43 PM
Project Title

Water Service Installation Services

Physical Address View project details and contacts
City, State (County) Palm Coast, FL   (Flagler County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work would include tapping the water main and setting a new water service at property line. In addition, the restoration of the City right of way to preexisting condition with proper compaction of disturbed soils. The selected contractor must be adequately staffed and equipped to perform the scope of work as defined below at all times. The City will supply all materials and the contractor will supply a 3 man crew, minimum of (2) 5 yd. dump trucks, JD 75 excavator or equivalent and a compactor to restore the job site to required conditions. Contractor will perform all the labor required to complete the job.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents