Similar Projects
Zidell Yards - Master Plan
New Construction
Conception
Portland, OR 97239

Pegasus Equestrian-Centered Resort
New Construction
Conception
$90,000,000 est. value
Oakland, OR 97462

The Welby
New Construction
Design
Portland, OR 97209

Portland Properr Hotel
Renovation - 170,000 SF
Design
Portland, OR 97209

D/B - Farm II - A New Construction Design-Build Project
New Construction
Post-Bid
$10,000,000 to $12,000,000 est. value
Pendleton, OR

Construction Manager - Construction Manager/General Contractor (CM/GC) Services - District-Wide Public Safety Office Renovations
Renovation
Post-Bid
$225,000 est. value
Portland, OR

Salmon Harbor Marina Office Building Addition
Addition - 320 SF
Results
Winchester Bay, OR 97467

Wastewater Treatment Plant 1 Collections and Maintenance Office Remodel
Renovation
Results
Coos Bay, OR 97420

Chegg T.I.
Renovation - 18,361 SF
Construction
Portland, OR 97201

Chegg T.I.
Renovation - 18,361 SF
Construction
Portland, OR 97201

Oregon State University Fairbanks Hall
Renovation
Pending Verification
$12,000,000 est. value
Corvallis, OR 97331

276 SE Stephens
New Construction - 3,960 SF
Conception
$1,100,000 est. value
Roseburg, OR 97470

Block 216/Ritz Carlton
New Construction - 1,100,000 SF
Design
$600,000,000 est. value
Portland, OR 97205

Multnomah County Library Operations Center - Bid Package 3.0
Renovation, Addition - 73,000 SF
Post-Bid
$32,000,000 est. value
Portland, OR 97230

Health & Human Services Building
New Construction - 30,000 SF
Results
Salem, OR 97301

Last Updated 07/18/2022 12:55 PM
Project Title

Orthgate Marketplace Expansion - Phase 2 / Medford

Physical Address View project details and contacts
City, State (County) Medford, OR 97501   (Jackson County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel, Office
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $65,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the expansion and new construction of a mixed-use center. The project will include six buildings offering a hotel, office buildings and more shops and a large parking area. As of July 8, 2022, the property is in the process of being sold and the project has been abandoned. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Office, 98,286 SF New Construction, Hotel/Motel, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents