Similar Projects
Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Kendall Executive Center Apartments
New Construction - 141,376 SF
Conception
$10,000,000 CJ est. value
Kendall, FL 33193

Oak Villages
New Construction
Design
$10,000,000 est. value
Fort Myers, FL 33966

Indian Creek Apartments
New Construction, Renovation, Addition
Design
Miami Beach, FL

Gulf Coast Town Center
New Construction - 437,301 SF
Bidding
$80,000,000 est. value
Fort Myers, FL 33913

Cape Coral Apartments
New Construction
Bidding
$60,000,000 est. value
Cape Coral, FL 33909

Structural Repairs, Renovation and Partial Demolition
Renovation
Post-Bid
Belle Glade, FL 33430

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Post-Bid
North Miami, FL

Downtown Properties Redevelopment Project Phase One - Development
New Construction, Infrastructure
Results
Oakland Park, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Construction
$10,000,000 est. value
Coconut Grove, FL

Aero Vue Crossings
New Construction
Pending Verification
Kissimmee, FL

The Villas at Lee Street
Renovation, Demolition
Pending Verification
$2,000,000 est. value
Leesburg, FL 34748

Azul at Stuart
Renovation - 79,948 SF
Conception
Stuart, FL 34994

Midtown 7
New Construction
Design
$10,000,000 CJ est. value
Miami, FL

Reported 06/28/2022 10:49 AM
Project Title

Wesley Chapel Residential Development

Physical Address View project details and contacts
City, State (County) Wesley Chapel, FL 33543   (Pasco County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location and scope details have not been released. As of June 27, 2022 the project is in planning stage and seeking rezoning approval. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents