Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Auditorium Lighting
Alteration
Bidding
Hampton, NH 03842

Purchase and Installation of a Backup Generator
Alteration
Bidding
$24,000 est. value
Atkinson, NH

Fy21 R1 New England Electric Supply
Term Contract
Post-Bid

Energy Performance Contracting Services
Alteration
Post-Bid
Raymond, NH

Community Solar Photovoltaic (PV)
Results

City Hall Electrical Renovations
Results
$1,800,000 to $2,200,000 est. value
Portsmouth, NH 03801

Trolley Car Lane Sewer Booster Pump Station Replacement 500 HP Variable Frequency Drive
Alteration
Post-Bid
Derry, NH

Switch Gear Repair Services at Pease Air National Guard Base, NH
Results
Portsmouth, NH 03801

Trailer-Mounted Generator
Alteration
Post-Bid

Nesmith Library Solar Photovoltaic System (PV) Installation
Results
Windham, NH 03087

Generator Supply and Install
Alteration
Post-Bid

Landfill Solar
Results
Exeter, NH

Generator Replacement at Derry Main Influent Sewer Pump Station
Results
Derry, NH

Stiles Road Sewer Lift Station Generator
Results
Salem, NH 03079

Last Updated 04/08/2022 10:00 AM
Project Title

General Electrician Services

Physical Address View project details and contacts
City, State (County) Salem, NH   (Rockingham County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On-Call Electrical Services includes but is not limited to the labor, materials, equipment, tools, and supervision necessary for the service, repair, maintenance, replacement, installation, and/or upgrade of electrical systems in all municipal buildings (APPENDIX A) in the Town of Salem NH. On-Call Electrical Services includes response to service requests as well as emergency response for related electrical needs. Contractor must respond to Municipal Services, generally the Facilities Foreman, however there may be a designee, by phone, in a timely manner not more than eight (8) hours after receiving a service request call and must be prepared to have an employee on site within twenty-four (24) hours of the phone call. If service is an emergency, contractor must respond by phone within one (1) hour and work must be started within four (4) hours. A site visit to a location identified in advance must be scheduled in a reasonable period. This should normally occur within 48 hours, but as needs and circumstances will vary, it is expected that a contractor will accommodate the needs accordingly. All appointments made between the Contractor and Municipal Services must be kept unless the two agree to a change. Failure on a Contractor’s part to keep appointments may result in termination of the contract. All quotes/estimates for work will be done at no cost to Town.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents