Similar Projects
Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

CHS Courtyard Drainage and JES Parking Lot Improvements
Infrastructure
Bidding
$470,000 CJ est. value
Central Point, OR 97502

Academy Place Waterline Relocation
Infrastructure
Bidding
$700,075 CJ est. value
Medford, OR 97501

2022 Misc Overlays
Infrastructure
Post-Bid
White City, OR

Ashland Municipal Airport Taxiway Reconstruction and Rehabilitation
Infrastructure
Post-Bid
$1,875,390 CJ est. value
Ashland, OR 97520

East Vilas Road Widening
Infrastructure
Results
White City, OR

Pine and Hamrick Intersection Improvements
Infrastructure
Results
$700,000 to $1,200,000 est. value
Central Point, OR 97502

Phoenix Government and Public Safety Center Project
New Construction, Infrastructure
Construction
$25,100,000 CJ est. value
Phoenix, OR 97535

Design of Zone 2 Pumping at Barnett Reservoir - City of Medford
Infrastructure
Construction
$344,700 CJ est. value
Medford, OR 97501

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Pending Verification
$10,000,000 CJ est. value
Talent, OR 97540

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Pending Verification
$10,000,000 CJ est. value
Talent, OR 97540

Crews Road Reconstruction - Jackson County
Infrastructure
Conception
$528,000 CJ est. value
Medford, OR 97501

Last Updated 04/12/2023 08:35 PM
Project Title

Table Rock Elementary School Project

Physical Address View project details and contacts
City, State (County) White City, OR 97503   (Jackson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of: Site work, utility connections, sidewalks, construction of a covered pavilion, and finishes in factory-built building The District reserves the right to reject any or all bids, to waive formalities, and to postpone the award of the contract for thirty (30) days. All bids and all prices quoted in bids shall be firm for a period of sixty (60) days after the bid closing date

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents