Similar Projects
Road Ranger #285 / Seguin
New Construction, Infrastructure - 12,676 SF
Post-Bid
$2,100,000 CJ est. value
Seguin, TX 78155

Seguin Police Department Parking Lot Improvements
Infrastructure
Results
$455,000 CJ est. value
Seguin, TX 78155

Shell Building for Starbucks / Schertz
New Construction, Infrastructure - 2,153 SF
Post-Bid
$700,000 CJ est. value
Schertz, TX 78108

Water Treatment Plant Surface Water Booster Station Pumps Variable Frequency Drive Replacement
Renovation
Post-Bid
$250,000 CJ est. value
Seguin, TX 78155

5720 IH 10 12" Waterline Extension
Infrastructure
Post-Bid
$187,500 CJ est. value
Marion, TX 78124

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

United Alloy / Phase 2
Addition, Demolition, Infrastructure - 110,423 SF
Pending Verification
$10,000,000 CJ est. value
Seguin, TX 78155

Storage King USA Lettau Addition / Seguin
New Construction, Infrastructure - 17,440 SF
Design
$784,800 CJ est. value
Seguin, TX 78155

La Quinta Inn & Suites by Wyndham Seguin / EV Charging Stations
New Construction, Infrastructure - 250 SF
Design
$150,000 CJ est. value
Seguin, TX 78155

Storage King USA Addition / Seguin
New Construction, Infrastructure - 55,419 SF
Design
$3,340,045 CJ est. value
Seguin, TX 78155

Target 2023 / San Antonio
Demolition, Renovation, Infrastructure - 61,493 SF
Pending Verification
$2,534,491 CJ est. value
Selma, TX 78154

School of Science & Technology - Phase 2
New Construction, Infrastructure - 65,728 SF
Pending Verification
$24,000,000 CJ est. value
Schertz, TX 78154

School of Science and Technology - Schertz Phase 2
New Construction, Infrastructure
Sub-Bidding
$4,940,038 CJ est. value
Selma, TX 78154

AutoZone #5755 / Seguin
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Seguin, TX 78155

Buffalo Heights Retail Shell Site Work and Utility Improvements
New Construction, Infrastructure - 68,876 SF
Pending Verification
$11,209,206 CJ est. value
Cibolo, TX 78108

Last Updated 08/15/2022 10:36 AM
Project Title

Schertz Soccer Complex Water Storage and Well Improvements

Physical Address View project details and contacts
City, State (County) Schertz, TX 78154   (Guadalupe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions are due in writing no later than June 29, 2022, at 12:00 P.M. (CST). All Requests for Proposals must be in the City of Schertzs possession on or before the scheduled date and time (no late BID will be accepted). The City of Schertz reserves the right to refuse and reject any or all responses, waive any or all formalities or technicalities, accept the response or portions of the response determined to be the best value and most advantageous to the City, and hold the responses for a period of 120 days without taking action. The City of Schertz reserves the right to accept responses from more than one firm determined to be the best option for the City. Respondents are required to hold their responses firm for the same period of time. The work proposed in this contract includes, but is not limited to: 1. Establish stormwater controls 2. Pull existing well pump and remove and replace existing well piping, well pump motor assembly. 3. Demolish two existing small steel tanks and pad. Remove conflicting underground piping. 4. Provide temporary piping and electrical connections to maintain ability to use pump to fill remaining storage tank, and utilize irrigation pumps to site. 5. Install new plant piping to connect new storage tank to existing system and to connect existing well to new storage tank. 6. Install new 12,500 gallon galvanized, lined, storage tank, with the concrete foundation,tank vent, ladder, drain, overflow, hatches, associated appurtenances. 7. Reconnect existing electrical connections to existing onsite pumps and well pump. 8. New light pole and foundation 9. New concrete pad for existing pumps. Reassemble pumps on new pad and provide start up services to confirm functionality remains. 10. Miscellaneous site and other work necessary or incidental for completion of the project PHASE1 Installation of temporary storm water pollution prevention plan and removal of well pump/motor and piping. Replace with new well pump/motor assembly and well piping. PHASE2 Replace fill piping on site to existing galvanized tank. Demolishing existing steel storage tanks, and underground piping in conflict with new construction PHASE3 Install new piping, concrete foundations, and storage tank. PHASE4 Final grading and facility startup. Any miscellaneous construction items necessary for completion of project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents