Similar Projects
Mixed-Use Development
New Construction - 35,000 SF
Conception
$60,000,000 est. value
South Bend, IN 46601

Kroger #903-08
Renovation
Design
South Bend, IN 46614

Sephora
Renovation - 2,500 SF
Design
Mishawaka, IN 46544

Kroger #889-08
Renovation - 42,989 SF
Post-Bid
Mishawaka, IN 46545

JD Sports Fashion #52
Renovation - 6,439 SF
Post-Bid
Mishawaka, IN 46545

Walmart Supercenter #3436-244 - D9 Gun Removal
Renovation - 20,677 SF
Construction
$8,500 est. value
South Bend, IN 46614

Big Lots
Renovation - 50,664 SF
Construction
South Bend, IN 46614

Mill at Ironworks Phase II
New Construction
Pending Verification
$47,600,000 est. value
Mishawaka, IN

Simply Yours Bridal
Build-Out - 8,000 SF
Pending Verification
Granger, IN 46530

Ulta Beauty at Target #1902
Renovation - 1,000 SF
Design
South Bend, IN 46614

Buy Buy Baby
New Construction, Addition - 24,779 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Granger, IN 46530

Shoot Point Blank
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Mishawaka, IN

Walmart Supercenter #2678-247 - OGP-CE
Renovation - 850 SF
Design
Mishawaka, IN 46545

Stanton Optical
Renovation - 4,000 SF
Post-Bid
Mishawaka, IN

Walmart Supercenter #2678-246 - Smart Bundle
Renovation - 208,653 SF
Design
Mishawaka, IN 46545

Reported 04/29/2022 12:00 AM
Project Title

Lululemon #15206 - University Park Mall

Physical Address View project details and contacts
City, State (County) Mishawaka, IN 46545   (Saint Joseph County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a 4,300 SQFT retail store.

Details

Retail, 4,300 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents