Similar Projects
Fire Services Administration Building
New Construction - 35,000 SF
Conception
$13,200,000 est. value
Pasadena, TX

Rebuild Station #7
New Construction
Conception
$5,740,000 est. value
Pasadena, TX 77504

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Cypress Creek Fire Station Number 25
New Construction - 9,000 SF
Post-Bid
Less than $7,000,000 est. value
TX

Fire and Rescue Fire Administration and Maintenance Facility
New Construction
Post-Bid
Sheldon, TX

Construction of the Sheldon Community Fire and Rescue Fire Administration and Maintenance Facility
New Construction - 28,500 SF
Results
Less than $10,000,000 est. value
Houston, TX 77049

CMAR for the Public Safety Building
New Construction
Results
Less than $55,000,000 est. value
Baytown, TX 77521

New EMS Station 97
New Construction - 4,000 SF
Construction
Humble, TX 77346

Community Volunteer Fire Department Temporary Dispatch Facility
New Construction
Construction
TX

HCFMO - Training Facility Atascocita
New Construction
Pending Verification
Houston, TX

Rebuild Station #6
New Construction
Conception
$5,740,000 est. value
Seabrook, TX 77586

New Fire Station 29
New Construction - 16,165 SF
Post-Bid
Humble, TX 77346

The Renovation and Addition to Klein Fire Station Number 6
Renovation, Addition - 9,500 SF
Results
$3,000,000 to $3,500,000 est. value
Tomball, TX 77377

Fire Station 10 Renovations
Renovation
Conception
Houston, TX

Fire Station 52 Renovation
Renovation - 1,965 SF
Post-Bid
Huffman, TX 77336

Last Updated 07/26/2022 10:32 AM
Project Title

Repairs and Modifications to a Dorm Room at Station 63

Physical Address View project details and contacts
City, State (County) Houston, TX 77073   (Harris County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repairs to an Existing Facility Project identification: The scope of this project is to modify and repair approximately 625 square feet of the interior of an existing fire station occupied constructed in 2017. There are currently four (4) double open access sleeping quarters each having two (2) beds within each room. The end product will have five (5) single person bedrooms. This work will require modifications to gypsum board ceilings and walls, painting, cabinetry work, doors, hardware, millwork, and minor electrical work. Email proposals will NOT be accepted. Contact Fred Windisch with Ponderosa Fire Department at FWindisch@ponderosavfd.org for questions related to the bid documents.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents