Similar Projects
Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Zeidler Municipal Building, 2nd Floor, Health Lab HVAC Upgrades
Results
Milwaukee, WI 53202

Unit Heater Replacement
Results
Milwaukee, WI 53216

Testing, Certification, Preventive Maintenance, and Repair Services for Fume Hoods, Clean Rooms, Biosafety Cabinets, etc.
Term Contract
Post-Bid
Milwaukee, WI

OCC Dust Collector Replacement B121
Results
Oak Creek, WI 53154

HQ Chiller Compressor Replacements and Four-Year HVAC Maintenance Services
Term Contract
Post-Bid
Milwaukee, WI 53204

Laboratory Mechanical Improvements - General
Renovation
Results
Less than $2,300,000 est. value
Milwaukee, WI 53211

HVAC and Mechanical Products
Term Contract
Post-Bid

Laboratory Mechanical Improvements - MEP
Results
Less than $2,300,000 est. value
Milwaukee, WI 53211

Stainless Steel Mechanical Joint Tapping Sleeves
Term Contract
Post-Bid
Milwaukee, WI

Fire Department Chiller Replacement
Results
West Allis, WI 53214

Wilson Park Senior Center Boiler and Exhaust Fan Replacement
Post-Bid
Milwaukee, WI 53221

Kinnickinnic Bus Storage Garage HVAC Replacement
Results
Milwaukee, WI 53204

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

Reported 03/06/2021 12:00 AM
Project Title

Install Furnace and Central Air Unit

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53206   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor, materials and services necessary to remove existing furnace and install new furnace and central air conditioning unit at 3537 North 91h Street. Install a new thermostat, Honeywell Set Back or equal, non-battery operated, on first floor in a central Location. Thermostat to work for both heat and A/C. Furnace to have exterior filter rack that can be easily removed and reinstalled. All heating equipment is to be installed according to manufacturers recommendations and per applicable codes. Furnace to be wired on a dedicated service. All electrical connections to be completed by contractor. System to be balanced for equal service throughout. Furnace must be elevated 8" off the floor. Contractor to remove all debris from property after work is completed. Contractor to leave existing furnace on site for removal by HACM staff.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents