Similar Projects
Innovation Court Apartments
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Appleton, WI 54914

Innovation Court Apartments
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Appleton, WI 54914

Appleton Lower Dam Gates 1-5 Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Appleton, WI 54911

Snow and Ice Plowing: Airport Landside
Term Contract
Post-Bid
Appleton, WI 54914

Snow and Ice Plowing: Airport Airside
Term Contract
Post-Bid
Appleton, WI 54914

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

9th Street Area Utility Relay
Results
Kaukauna, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

Kwik Trip #887 Building Addition / Grand Chute
Addition, Demolition, Infrastructure - 1,463 SF
Pending Verification
$400,000 CJ est. value
Appleton, WI 54913

Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

CTH Z - Curb Replacement and Sidewalk Installation
Results
Kaukauna, WI

O'Reilly Auto Parts (HRV) #6611 / Hortonville
New Construction, Infrastructure - 7,225 SF
Construction
$1,300,000 CJ est. value
Hortonville, WI 54944

Last Updated 03/17/2023 04:08 AM
Project Title

2023 Street Reconstruction State Street and Janssen Street

Physical Address View project details and contacts
City, State (County) Combined Locks, WI 54113   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,192,865 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of reconstructing State Street (Park Street to Ryan Street) and Janssen Street, as well as some minor restoration along Wallace Street. The work generally includes preparing the existing base course, new concrete streets (currently asphalt), curb and gutter (integral & standard), driveway aprons, sidewalks, utility adjustments, guard rail, pavement markings and associated grass restoration. The project also includes the reconstruction (cast-in-place) of an existing bridge deck and sidewalk (approx. 47'x41') over Garners Creek, including new concrete pavement approach slabs. The existing bridge abutments are not planned to be replaced or reconstructed as part of the project. State Street experiences significant semi-truck traffic coming to and from the McKinley Paper Mill (540 Prospect Street), which has 10 driveway access points located within the project limits. In order to maintain access and operations for the Mill, the project is planned to be constructed in three (3) general phases as described in the plans and special provisions. Fox Valley & Lake Superior (FOXY) / WATCO owns railroad right-of-way within the project limits and will require coordination, permitting and flagging. The project includes approximately 6,620 square yards of 9-inch doweled concrete street pavement (integral curb), 7,790 square yards of 9-inch doweled high early concrete street pavement (integral curb), 1,700 square yards of 7-inch concrete pavement (integral curb), 410 square yards of HMA pavement, 340 linear feet of standard concrete curb and gutter, 5,310 square feet of concrete driveway aprons, 970 square yards of HMA driveway restoration and 13,230 square feet of concrete sidewalks. An Alternate Bid is included to reconstruct the bridge deck and sidewalk with pre-cast planks and a concrete pavement overlay. A Supplemental Bid is included to re-seal the Mill's employee parking lot, including new pavement markings. C0006 9-21-00351

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents