Similar Projects
Susan Campbell Sidewalk Improvement Project
Infrastructure
Bidding
Eugene, OR 97403

Klamath, Lake and Deschutes County Curb Ramps Project
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

US395: Sidewalk Improvements (John Day) Project
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
OR

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Parking Lot Asphalt at SRCI
Infrastructure
Results
Ontario, OR 97914

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

R4 Headquarters Empire Avenue Driveway Landing
Infrastructure
Results
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

ADA Ramps South West Farmington Road Multiple Locations
Infrastructure
Results
$750,000 to $1,500,000 est. value
Beaverton, OR 97003

I-5 /OR99/OR238/US199/OR62/OR140 - Curb Ramps Project Various Highways
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

Last Updated 12/10/2021 05:35 AM
Project Title

OR99/I-5 Curb Ramps Project on Various Highways in Medford, Talent, and Ashland

Physical Address View project details and contacts
City, State (County) OR   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Req. approx. 600 hr training; 2,355 ft2 temp. signs; 5,160 hr flaggers; 35 ea. TCS; 3,900 ft ped. chan. dev.; 150 ea. temp. curb ramp; 4,000 ft2 temp. walks; 10 ea. conc. washout fac.; 81 ea inlet protect.; const. surv. work; 7,283 yd2 rem. curb ramp, walk, curb, surf.; 1,928 yd3 gen. exc.; 128 ft culv. pipe; 130 ft strm. sewer pipe; 4 ea. conc. MH; 19 ea. conc. inlets; 29 ea. adj. boxes; 43 ea. adj. inlets; 3,415 ton agg. base; 1,205 ton ACP; 1,180 ft2 asph. slope paving; 8,410 ft conc. curbs; 657 ft2 conc. islands; 2,540 ft2 conc. drvwy.; 35,378 ft2 conc. walks; 159 ea. curb ramps; 2,091 ft2 trunc. domes; 657 ft2 durable grouted rock; 1,398 ft2 pvmt. bar; 11 ea. xwalk closure sup.; 414 fbm wood sign posts; 1,872 lb PSST sign sup.; 69 ft2 signs; flashing beacon install.; 0.25 ac. seeding; 55.2 yd3 bark mulch. Completion Time: November 10, 2022. Classes of Work: either: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents