Similar Projects
Wastewater Expansion Construction (Parallel Plant) - City of Flowery Branch
Addition, Demolition, Infrastructure
Conception
$20,034,002 CJ est. value
Flowery Branch, GA 30542

Tanners Bridge Water Treatment Facility Operations Building - Barrow County
Renovation
Conception
$325,000 CJ est. value
Monroe, GA 30656

Water Treatment Plant Raw Water Holding Pond Dam
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Carrollton, GA 30117

West Water Pollution Control Plant Screen Addition
Renovation
Bidding
$150,000 CJ est. value
Villa Rica, GA 30180

Flat Creek WRF Clarifier Renovation
Renovation
Post-Bid
Gainesville, GA 30504

North Oconee WRF and Middle Oconee WRF Improvements
Renovation
Post-Bid
$23,000,000 to $26,000,000 est. value
Athens, GA 30605

NOWRF and MOWRF Tertiary Filtration
Results
Athens, GA

Sludge Dewatering and Drying Facilities
New Construction
Results
Concord, Griffin, GA 30223

Tanners Bridge Water Treatment Facility Effluent Filter - Barrow County
Renovation
Conception
$400,000 CJ est. value
Monroe, GA 30656

Hugh A. Wyckoff WTP Filter Rehabilitation Project
Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Acworth, GA 30101

US-78 Lanier Sewer Pump Station Decommissioning
Demolition
Post-Bid
GA

Withlacoochee WPCP Lab And Shop Bldg Design And Construction
New Construction - 3,200 SF
Results
Valdosta, GA 31601

RFP Construction Manager at Risk - North Bryan County Water Reclamation Facility
Renovation, Infrastructure
Bidding
$900,000 CJ est. value
Ellabell, GA 31308

NCWRF and SCWRF Structural Assessments and Repairs
Renovation
Post-Bid
Columbus, GA 31904

South Central Headworks WWTP Concrete Channel Rehabilitation
New Construction
Results
$299,750 est. value
Douglasville, GA

Last Updated 10/24/2022 11:20 AM
Project Title

Barber Creek Water Reclamation Facility (WRF) System Upgrades - Phase 2 - Construction - Barrow County

Physical Address View project details and contacts
City, State (County) Winder, GA 30680   (Barrow County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,173,231 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Barber Creek Water Reclamation Facility (WRF) System Upgrades - Phase 2 - Construction. As of October 24, 2022, detailed scope has not yet been determined. This project is in included in the City's or County's FY 2023 Capital Improvement Plan (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents