Similar Projects
Fanno Creek Trail Improvements at Scholls Ferry Road
Infrastructure
Bidding
$199,000 est. value
Hillsboro, OR 97129

Fleet Shop and Parking Lot Expansion
Addition, Infrastructure
Bidding
$3,000,000 est. value
Hillsboro, OR 97124

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Pavement Management Program Preventative Maintenance
Infrastructure
Post-Bid
$566,800 est. value
Tigard, OR

Region 2 Signal Improvements Area 1 and 3 (Const) Project Various Highways
Infrastructure
Results
$500,000 to $1,000,000 est. value

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Dirksen Nature Park Tigard Street Community Trail
Infrastructure
Bidding
$700,000 est. value
Tigard, OR 97223

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

OR8 at River Road Section
Infrastructure
Results
$500,000 to $1,000,000 est. value
OR

ADA Ramps South West Farmington Road Multiple Locations
Infrastructure
Results
$750,000 to $1,500,000 est. value
Beaverton, OR 97003

2021 ADA Ramps East
Infrastructure
Results
$600,000 to $1,000,000 est. value
OR

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

2021 ADA Ramps West
Infrastructure
Results
$600,000 to $1,000,000 est. value
OR

OR10 and OR99E - Curb Ramps
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

Last Updated 06/19/2022 11:17 PM
Project Title

ADA Ramps 2022 - Southwest Farmington Road

Physical Address View project details and contacts
City, State (County) Hillsboro, OR 97129   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Construct roadway improvements including concrete curbs, sidewalks, curb ramps, and traffic signal modifications. 2. Install, maintain, and remove temporary traffic control and erosion control measures. 3. Perform all removal of structures and obstructions, clearing and grubbing, and earthwork operations. 4. Perform additional and Incidental Work as called for by the Specifications and Plans

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents