Similar Projects
Roofing Services for Buildings Across all Campus Locations
Term Contract
Bidding
Jamestown, NC

Roof Replacement at Four (4) Guilford County Buildings
Alteration
Bidding
Greensboro, NC 27401

Roofing Repairs and Maintenance
Post-Bid
Greensboro, NC 27401

Roofing MACC
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Gtcc - Davis Aviation Center Roof Coating
Post-Bid
Greensboro, NC

Fire Station 1 Roof Replacement
Results
$49,500 est. value
High Point, NC 27262

Roofing Repair and Maintenance
Post-Bid

Auxiliary Gym Roof Replacement for Dudley High School
Results
Greensboro, NC 27401

Roof Replacement
Alteration
Post-Bid
Greensboro, NC

2020 Roof Replacement - Welborn Middle School
Results
$274,000 est. value
High Point, NC 27265

Johnston Street Global Roof Replacement
Alteration
Post-Bid
High Point, NC 27262

Roof Replacement - HPHA Main Office
Results
High Point, NC 27260

Gym Roof Replacement
Alteration
Post-Bid
Oak Ridge, NC 27310

Reported 08/27/2021 12:00 AM
Project Title

Roof Replacement for Oakview Elementary School

Physical Address View project details and contacts
City, State (County) High Point, NC 27265   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant - 08/11/21
Owner View project details and contacts
Architect View project details and contacts
Description

A brief description of work in the project follows: • Roof Size is approximately 40,000 sq. ft. • Tear-off existing membrane down to the structural deck and installation of a temporary watertight roofing membrane. Deck type varies with each roof area. • Insulation system for Base Bid shall be cellular Lightweight Insulating Concrete (LWIC). • The replacement membrane assembly consists of the application of PVC single-ply membrane fully adhered to the insulation. Scope of Work includes installation of new perimeter wood nailers and edge metal. • Work includes all sheet metal fabrications shown on the contract documents and as specified. • Roofing membrane installation shall be required on-going inspections by the membrane manufacturer during the installation process and will be eligible to receive a 20 year NDL material and labor warranty, full-system including the LWIC and membrane.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents