Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Results
Less than $19,000,000 est. value
Tampa, FL 33602

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

DLTWTF Master Plan Improvements Design Build
Results
$19,000,000 est. value
Tampa, FL

Miscellaneous Pump Station Construction
Results
Less than $660,000 est. value
Tampa, FL 33601

Lift Station SA Rehabilitation
Results
$1,750,000 est. value
Tampa, FL 33617

Dayflower Pump Station Rehabilitation
Results
Less than $500,000 est. value
Tampa, FL

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Progressive Design Build South County Potable Water Booster Pump Station
Results
Less than $12,000,000 est. value
Tampa, FL 33601

Construction Manager at Risk (CMAR) Services for the Southern Hillsborough County Supply Expansion: Booster Pump Station - Brandon Booster Station Project
Results
Tampa, FL

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Professional Design Build Services for Construction Of The David L. Tippin Water Treatment Facility High Service Pump Station and Misc. Improvements
Results
Less than $50,000,000 est. value
Tampa, FL 33610

Lift Station Upgrades for Maniscalco Elementary School and Leto High School
Results
Lutz, FL 33549

Manhole-Wastewater Lines Lift Station Cleaning & Inspection Services
Results
$2,000,000 est. value
FL

Lift Station Upgrades for Essrig Elementary School and Jefferson High School
Results
Tampa, FL 33624

Lift Station Renovation for South County Career Center
Renovation
Results
Ruskin, FL 33570

Last Updated 01/06/2021 08:38 AM
Project Title

South County Potable Water Repump Station Expansion

Physical Address View project details and contacts
City, State (County) Ruskin, FL 33570   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,240,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Contractor to expand the treatment capacity of the South County Potable Water Repump Station. Water Resources Division is expanding the treatment capacity of the South County Potable Water Repump Station (SCPWRS). The SCPWRS is located at 233 TECO Road, Ruskin Florida 33570. The work includes but shall not be limited to: labor, equipment, permits, supervision, project management, clerical, testing, CAMS, surveying, testing, and administration to construct a completely operational processing facility upgrade.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents