Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Flood Control Inlet Concrete Repair, Littleville Lake, Huntington, Ma
Design
Huntington, MA 01050

Maintenance of Detention Basins at Various Locations
Infrastructure
Bidding
$90,800 est. value

Adjust/Reset Existing Structures
Infrastructure
Bidding
$292,500 est. value
Dartmouth, MA

Excavate Slope and Haul Off Site
Post-Bid
Less than $35,000 est. value
North Adams, MA

Annual On-Call Drainage Construction Services-2021
Term Contract
Post-Bid
$167,000 est. value
South Dennis, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Drilling IDIQ in Massachusetts and Rhode Island
Results

Safety Improvements to Little Mohawk Road Including Reclamation, Culvert Placement and Paving
Infrastructure
Bidding
$837,275 est. value
Shelburne, MA 01370

1,400 Linear Feet of Retaining Wall Blocks
Post-Bid
Hudson, MA

Drainage Improvements on Laurel Lane
Results
Less than $190,000 est. value
Sandwich, MA

Bridge Drainage Installation and Rehabilitation at Various Locations
Renovation, Infrastructure
Bidding
$369,880 est. value
Rowley, MA

Install an Oil Water Separator
Post-Bid
$77,000 est. value
Taunton, MA

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $120,000 est. value

Twenty-Four Inch HDPE Pipe
Infrastructure
Bidding
Beverly, MA

Last Updated 05/06/2022 08:13 AM
Project Title

Johnson Brook Restoration

Physical Address View project details and contacts
City, State (County) Southwick, MA 01077   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of an existing concrete box culvert, construction of a new 19’ x 6’ open bottom concrete culvert, temporary stream flow bypass, step pool system, vegetated. Demolition of an existing concrete box culvert Construction of a new 19’ x 6’ open bottom concrete culvert, including headwalls and wingwalls Coffer dam and temporary stream flow bypass system Swale and step pool system, Vegetated coir log system, Drainage improvements, Sedimentation and erosion controls, including dewatering basin, Bridge Rail and Guardrails, Slope stabilization, Pavement and surface restoration. coir log system, and associated improvements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents