Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WRF Expansion Construction
New Construction
Conception
$1,800,000 est. value
Casa Grande, AZ

Water Reclamation Facility #6 Phase 1
New Construction
Design
$12,000,000 est. value
Buckeye, AZ

Wastewater Treatment Plant Headworks Improvements
Renovation
Design
Phoenix, AZ

Wastewater Treatment Plant, Biosolids Transport and Disposal
Term Contract
Post-Bid
Show Low, AZ

Wastewater Treatment Plant Modifications
Demolition
Post-Bid
Clifton, AZ

Water and Wastewater Vulnerability Assessment and Related Services
Term Contract
Results
Less than $75,000 est. value
Scottsdale, AZ 85258

Northwest Water and Wastewater Master Plan Package 4
Results
$37,000,000 est. value
Phoenix, AZ 85003

Central WWTP Improvements Phase 2
Renovation
Construction
$2,500,000 est. value
Buckeye, AZ

Transfer Station
New Construction - 10,500 SF
Pending Verification
Gilbert, AZ

Wastewater Operator and Repair Services for Picacho Peak State Park
Post-Bid
Picacho, AZ 85141

Northwest Water and Wastewater Master Plan Package 2
Results
$15,000,000 est. value
Phoenix, AZ 85003

Medium Coarse Headworks Bar Screen And Washer
New Construction
Post-Bid
Somerton, AZ

Northwest Water and Wastewater Master Plan Package 3
Results
$37,000,000 est. value
Phoenix, AZ 85003

Signal Butte Water Treatment Plant Expansion
Addition
Post-Bid
$70,000,000 est. value
Mesa, AZ

Last Updated 04/13/2022 03:56 PM
Project Title

Repair to Waste Water Treatment Plant 2, Ft. Huachuca, Arizona

Physical Address View project details and contacts
City, State (County) Fort Huachuca, AZ 85613   (Cochise County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of ten unique modifications to improve the functionality of the current waste water treatment plant. These modifications were adopted by the stakeholders of WWTP No. 2:

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents