Last Updated 01/04/2021 12:43 PM
Project Title

First Street NW, Second Street SW and Crooked Stick Lane Road Improvements

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $413,322
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not necessarily limited to, the following: 1st Street NW (Project No. 18-21): The drainage improvements and road reconstruction of 1st Street NW from 3rd Avenue NW to 2nd Avenue NW will consist of new HMA pavement, curb and gutter, sidewalks, drainage structures, and reconstruction of the north and south approaches of the Monon Trail to meet the reconstructed 1st Street NW crossing. 2nd Street SW (Project No. 17-SW-09): The sidewalk reconstruction along the north side of 2nd Street SW from 4th Avenue SW to approximately 130 feet west of the Monon Trail will consist of new sidewalk, modified curb, curb ramps, concrete approaches, drainage structure modification, water meter relocations, lawn grading, and sodding. Crooked Stick Lane (Project No. 17-SW-09): The drainage improvements of Crooked Stick Lane project will consist of 750 feet of new drainage structures, HMA patching, curb and gutter, lawn grading, and sodding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents