Similar Projects
Pavement Patching
Infrastructure
Bidding
$3,000,000 est. value
Lenexa, KS 66215

Grading, Bridge, and Surfacing
Renovation, Infrastructure
Bidding
$400,000 est. value
De Soto, KS 66018

2021 Street Maintenance Program
Infrastructure
Post-Bid
Edgerton, KS

On Call Paving Improvements
Infrastructure
Post-Bid
KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

2022 Nelson Street Improvements
Infrastructure
Bidding
$300,000 est. value
Edgerton, KS 66021

32nd Street and M Avenue Intersection Improvements
Infrastructure
Post-Bid
Anacortes, WA 98221

2021 Asphalt Overlay Program
Results
KS

SR 9, Northwest Region HMA Crack Seal and Pavement Repair
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Sedro-Woolley, WA

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

9th Street and UBAS Program
Infrastructure
Results
Prairie Village, KS

Darrington Ranger District Road Maintenance
Infrastructure
Bidding
Marblemount, WA

167Th & HWY Overpass Preliminary Engineering
Term Contract, Infrastructure
Post-Bid
Olathe, KS 66051

2021 Cars Webster Street
Alteration
Results
Spring Hill, KS

Reported 05/14/2022 12:00 AM
Project Title

2022 Overlay Project

Physical Address View project details and contacts
City, State (County) Lenexa, Overland Park, Shawnee, KS - Burlington, WA 66216   (Johnson (KS) - Skagit (WA) County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be delivered to 833 South Spruce Street, Burlington, Washington. Proposals received after the time fixed for opening will not be considered. This resurfacing project consists of a 2-inch structural overlay of Fairhaven Ave, Anacortes St, and Cascade Highway. Construction includes, but is not limited to: Hot mix asphalt; grinding; pavement markings; erosion/water pollution control measures and traffic control. The Engineer's estimate is $600,000. Should the suc- cessful Bidder fail to enter into such Contract and furnish satisfactory performance bond within the time stated in the Specifications, the Bid Proposal deposit shall be forfeited to the City of Burlington. CITY OF BURLINGTON is an Equal Opportunity Employer. The City of Burlington reserves the right to reject any or all Bids and to waive irregularities in the Bid or in the Bid opening. No Bidder may withdraw their Proposal after the hours set for the opening thereof, or before Award of Contract, unless said Award is delayed for a period exceeding sixty (60) days.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents