Similar Projects
RFP/Design Services - Rehabilitation of the California Wastewater Pump Station
Renovation
Conception
$135,000 CJ est. value
Klamath Falls, OR 97601

Swan Lake Energy Storage
New Construction, Infrastructure
Design
$800,000,000 CJ est. value
Pine Grove, OR 97603

OC&E State Trail
Infrastructure, Renovation
Design
$1,052,343 CJ est. value
Beatty, OR 97621

Treatment Plant Improvements Engineering Services
Infrastructure
Bidding
$300,000 CJ est. value
Klamath Falls, OR 97601

Road Striping Crater Lake NP
Infrastructure
Bidding
$250,000 CJ est. value
White City, OR 97604

Home2Suites by Hilton Hotel / Klamath Falls
New Construction, Infrastructure
Sub-Bidding
$12,000,000 CJ est. value
Klamath Falls, OR 97601

Drinking Water Distribution System Replacement Project
Term Contract
Post-Bid
Bly, OR

Bly Bley-Was Well Relocation and Waterline
Infrastructure
Post-Bid
Bly, OR

Underground Utility Locating Services
Infrastructure
Results
$890,000 est. value
Klamath Falls, OR

Central Parking Lot Rebuild
Infrastructure
Results
$381,560 CJ est. value
Klamath Falls, OR 97601

Oregon Department of Human Services Building at TimberMill Shores
New Construction, Infrastructure - 92,000 SF
Pending Verification
$30,000,000 CJ est. value
Klamath Falls, OR 97601

US 97 N. Klamath Falls Interchange to S. 6th Street
Infrastructure
Design
$10,197,390 CJ est. value
Chiloquin, OR 97624

Spring Street Sewer Treatment Plant - 3B GMP
Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Klamath Falls, OR 97601

Us 97 Hwy 4 Over Uprr Structure Approach Paving
Infrastructure
Results
$111,515 CJ est. value
Klamath Falls, OR 97601

RFP Construction Manager - F-15 Static Display and Plaza
Infrastructure
Post-Bid
$500,000 CJ est. value
Klamath Falls, OR 97601

Last Updated 06/15/2023 02:34 AM
Project Title

L. Lily New Test Well

Physical Address View project details and contacts
City, State (County) Chiloquin, OR 97624   (Klamath County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" Indian Health Service - Portland Area Office is issuing Request for Quote (RFQ) 75H70123Q00008 Project Title: L. Lily New Test Well Location: 0 Ranch Road Chiloquin, OR, 97624, Klamath County This RFQ is being solicited as 100% Small Business Set Aside under NAICS 237110, Water and Sewer Line and Related Structures Construction; $45.0M Size Standard. Magnitude of Construction is between $25,000.00 and $100,000.00 U.S. Department of Labor Wage Determination: WA20230007, dated 3/17/2023 is applicable to this solicitation. Quotes Due Date: May 11, 2023 no later than 2:00pm CST; Email to Robert.Miller2@ihs.gov . Contract Specific Terms & Conditions B.8.1. Bid Bond: A Bid Guarantee IS NOT required. B.8.2. Payment and Performance Bonds ARE NOT required in accordance with FAR 28.102-2. B.8.3. FAR Clause 52.228-13, Alternative Payment Protections IS NOT applicable UNLESS the value of the award exceeds $35,000 in accordance with FAR 28.102-3(b). B.8.4. Questions regarding the solicitation and project must be submitted in writing to Robert S. Miller, Contracting Officer, via e-mail at Robert.Miller2@ihs.gov. Questions will be accepted up to 7 days before quote due date. The Government is not obligated to answer any questions submitted after this date. B.8.5. Furthermore, all questions shall be submitted by the prime contractor(s) on behalf of their subcontractor(s) and supplier(s) to the contract Specialist. Questions submitted by subcontractors and/or suppliers directly to the contract specialist will be rejected and not answered. B.8.6. Quote Due Date: Quotes are to be submitted via e-mail to the assigned Contract Specialist/Contracting Officer by the date and time indicated in Block 13 of the SF1442. B.8.7. Quote Acceptance Period: Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. Question Deadline 05/04/2023 Questions regarding the solicitation and project must be submitted in writing to Robert S. Miller, Contracting Officer, via e-mail at Robert.Miller2@ihs.gov. Questions will be accepted up to 7 days before quote due date. The Government is not obligated to answer any questions submitted after this date. Wage Determination: Davis-Bacon wages shall be paid for all applicable labor categories for each price schedule line item and should be included in all pricing in accordance with FAR 52.222-6, Construction Wage Rate Requirements. The applicable Wage Determination is included as Attachment f in Section J. The most current version of the applicable Wage Determination will be included at time of award. B.7. Period of Performance The contractor shall proceed and complete the work, including cleanup within 90-days after issuance of the Notice to Proceed (NTP). The award is not the NTP for this contract work. Contract completion can be adjusted for any long lead items if requested in writing to the Contracting Officer. The contractor must not commence work until it has been issued a NTP. The award is not the NTP for this contract work. Prior to issuance of a NTP, the contractor must submit for approval performance and payment bonds, a project schedule showing the date when on-site work will begin, the date the work will be completed, and all required insurance. No work will be performed on Saturdays, Sundays, federal holidays, or Tribal holidays without the Government's consent. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents