Similar Projects
CAMP - EC Sanitary Sewer Repair
Post-Bid
Less than $200,000 est. value
Boulder, CO 80309

CAMP - Repair Culverts West of Kitt West
Post-Bid
Less than $100,000 est. value
Boulder, CO 80303

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

2020 CIPP Sewer Lining Project
Results
Less than $362,175 est. value
Louisville, CO 80027

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Grease and Septic Pumping Services
Post-Bid
Boulder, CO

2020 Manhole Rehabilitation Project
Results
Boulder, CO

Operation, Maintenance and Management of Water and Wastewater Treatment Facilities
Infrastructure
Post-Bid
Superior, CO

Sundar Development Infrastructure Extension
Results
Lafayette, CO 80026

2022 Sewer Rehabilitation - PVC Fold and form and UV CIPP
Infrastructure
Post-Bid
Boulder, CO

Resilient St Vrain Project: Izaak Walton Reach 1 - Utility Relocations
Results
Less than $2,280,000 est. value
Longmont, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Ultra Violet (UV) Cured-in-Place-Pipe (CIPP) Lining
Term Contract
Results
Broomfield, CO

Westerly Filing 1 Sanitary and Storm Sewer and Water Utilities Project
Results
CO

On Call as Needed Septic Tank and Vault Toilet Cleaning
Results
Longmont, CO

Last Updated 10/08/2021 11:35 AM
Project Title

2021 Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Longmont, CO   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of thirteen (13) manhole rehabs/linings, three (3) miscellaneous repairs (cut intruding tap, top hat install, cutting of liner flap), twenty-seven (27) CIPP linings of 8", 12", 15", and 18" mainlines, and sixteen (16) repair/replace of 8", 12", and 18" mainlines.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents