Similar Projects
Roadway Minor Rehab
Infrastructure
Conception
$8,561,755 CJ est. value
New Haven, OH 44850

Roadway Minor Rehab
Infrastructure
Conception
$8,561,755 CJ est. value
New Haven, OH 44850

Roadway Minor Rehab - US 20
Infrastructure
Design
$8,139,050 CJ est. value
Norwalk, OH 44857

Roadway Minor Rehab - US 20
Infrastructure
Design
$8,139,050 CJ est. value
Norwalk, OH 44857

2023 Mcguan Park Parking Lot Project
Infrastructure
Bidding
$169,355 CJ est. value
Norwalk, OH 44857

2023 Mcguan Park Parking Lot Project
Infrastructure
Bidding
$169,355 CJ est. value
Norwalk, OH 44857

Dollar General #24380
New Construction - 10,640 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Norwalk, OH 44857

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Purchase and Development of Old School Property
Infrastructure
Results
New London, OH

New State Road Resurfacing - Phase 6
Infrastructure
Results
$600,000 est. value
Norwalk, OH 44857

SR 13 - Roadway Minor Rehabilitation
Infrastructure
Design
$14,409,000 CJ est. value
Norwalk, OH 44857

2023 Resurfacing of Various Township Roads in Townsend and York Townships
Infrastructure
Bidding
$380,000 CJ est. value
Bellevue, OH 44811

Aaron's #1289 / Olena
Renovation - 14,865 SF
Post-Bid
$4,000,000 CJ est. value
Olena, OH 44857

2022 Chip and Seal - Phase 1 Project
Infrastructure
Results
$620,000 est. value
Norwalk, OH

Roadway Minor Rehab - US 250
Infrastructure
Design
$2,848,400 CJ est. value
Norwalk, OH 44857

Last Updated 05/15/2023 11:01 AM
Project Title

Dollar General #23546 / Willard

Physical Address View project details and contacts
City, State (County) Willard, OH 44890   (Huron County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,900,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*As of May 12, 2023, a general contractor has been awarded and all trades are let. Ground-up construction of a one-story retail building. The following trade(s) will be required to complete this project: Survey & Layout; Temp Fencing – 4’ Orange Construction Fence along entire Leach Field; include sign as noted on C-1 Note 4; Field Office - 8x20 Office/Storage Combo for up to 12 weeks; Portable Toilet - (1) one unit w/ sanitizer and weekly cleanout for up to 12 weeks; Dumpster - (1) one 30 Yard Container; Final Cleaning; Excavation & Site Utilities – Include all tree shrub removal and site prep, all work related to the waterline extension including traffic control, boring under State Route 99, removal & repair of drive culvert, gravel drive, mailboxes, existing signs removed and reinstalled as necessary, and seeding and mulching where necessary; review Waterline Extension plans for more details; erosion control, and storm work, all work related to proposed drive culvert & ditch work within the county right of way, Landscaping – Seed, Mulch, & Sod Asphalt Paving & Striping – Include all Striping, (3) Handicap Signs, & (26) Bumper Blocks Septic System – Furnish & Install (2) IM-1060 Infiltrator Tanks, EZ Series Complex Pump Control Panel, Green Coded Puraflo Peat Fiber Bio Filter Module w/ Sampling Basin, Ball Valve w/ Valve Box, Utility Cleanout, & Gravel Trench as per plans and specs; Irrigation – Sodded areas only; Fencing & Gates – Galvanized Chain Link Fence & Gates in front of Stormwater Management Area; Pressure Treated Rough Sawn Cedar Fence and Vinyl Coated Chain Link Gates w/ Vertical Slats (Dk Brown) at the Dumpster Enclosure; Concrete – Include Foundation and Footers, Standard Duty Concrete at ADA Parking Area, Heavy Duty Concrete at Dumpster Enclosure & Receiving Ramp, Sidewalks, Integral Curbs, & Walk, Structural Steel - Anchor Bolts & (6) Bollards; Pre-Engineered Metal Building - Erection ONLY; Metal Stud/Track Framing & Drywall – Include ALL wood blocking, sheathing and backing, include install of doors, frames, hardware, cart coral, and restroom accessories. Furnishing and Install FRP, vinyl cover base, water heater shelf, corner guards, aluminum wall cap at breakroom/office partition wall; Nichiha – Brick Panel; Plymouth Brick - Materials and Labor Caulking; Doors/Frames/Hardware - Required Dollar General Vendor Cook & Boardman Automatic Sliding Glass Doors - Required Dollar General Vendor Record USA Flooring - Retroplate Certified Concrete Polishing Painting – Include Floor Striping & Sealer; Bathroom Accessories - Required Dollar General Vendor Cook & Boardman Communications Equipment - Required Dollar General Vendor Crosscom Plumbing - Include excavation and backfill, include gas line; HVAC - Include RTU's from Dollar General Required Vendor York w/ lead times; Electric - Include furnish & install from Dollar General Required Vendors WESCO, USLED, Graybar, & EMS System from Emerson; See contact information notated on T0.1; include conduit and conductors for underground service & Pump Power Cables & Float Control Wiring, see details on C-3 for underground service and SP-4 for pump/control details; *As of April 17, 2023, some changes have been made to the plans: Below are the changes as we have been able to determine, please review all pages for any adjustments necessary to your scope of work and or price. Use this opportunity to sharpen your pencils and provide us your best price. Omit watermain extension work, we need to come from the curb stop to the building with a water line per plans no watermain extension work is to be included in our price, the developer is handling that direct. Excavation. C-2 – Added (2)Parking Blocks and (2) Bollards. Asphalt and Concrete. A03 – Electrician to furnish and install a 2” conduit for satellite not a 1.5” conduit. A03B – Electrician to maintain fire rating with cable tray penetrations through the rated wall. A07 – Increased quality of casters for swing gate. Fencing. E1.1 – Removed refrigeration panel notes / requirements. Added Dosing Pump Panel note. Electrical. E1.3 – Made convenience outlets on RTU’s GFCI, not previously noted as such. Electrical. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

1 Story Above Grade, 12,480 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents