Similar Projects
CID 05 - 2020 Ground Storage Tanks - E
Post-Bid
$724,000 est. value
Elmendorf, TX 78112

CID 04 - 2020 Composite Elevated Storage Tank - D
Post-Bid
$1,065,000 est. value
Elmendorf, TX 78112

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

NACO Ground Storage Tank Rehabilitation Project
Results
Less than $1,884,210 est. value
San Antonio, TX 78233

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Grass Hill Elevated Storage Tank Painting and Rehabilitation
Results
$326,000 est. value
Leon Valley, TX 78238

Peppermint Elevated Storage Tank Rehabilitation
Post-Bid
Less than $486,000 est. value
Kirby, TX 78219

Construction of Wastewater Treatment Plant Driveway, Effluent Line to Discharge Point and Recycle Waterline Offset
Results
San Antonio, TX

2020 Water Production Storage Tank Facilities Project
Post-Bid
San Antonio, TX 78212

West Avenue Elevated Storage Tank Painting and Rehabilitation Project
Results
Less than $2,588,700 est. value
San Antonio, TX 78212

Construct Elevated Storage Tank with Alternant Bid, Replace Booster Station and Ground Storage Tank at the Michael Unit
Post-Bid
San Antonio, TX 78200

Grass Hill Elevated Storage Tank Painting and Rehabilitation
Results
Less than $350,000 est. value
Leon Valley, TX 78238

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Naco Ground Storage Tank Rehabilitation Project
Results
Less than $1,520,000 est. value
San Antonio, TX 78233

Rain Harvesting Installation
Post-Bid
San Antonio, TX 78215

Last Updated 07/29/2020 03:22 PM
Project Title

Northeast Service Center Underground Storage Tank Permanent Removal Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78233   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $148,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

San Antonio Water System for removal of underground fuel storage tank, above-ground fuel dispensing facilities and all related appurtenances both above and below ground. The work also includes stockpiling and testing of excavated soil, backfill of excavated ground and disposal of all the demolition materials per applicable state and federal codes and regulations. The work is located at the site of Northeast Service Center at 13655 O’Connor Road, San Antonio, TX 78233.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents