Similar Projects
Walnut Ridge
New Construction
Conception
High Point, NC 27265

Market Square
New Construction
Conception
High Point, NC 27262

Townsend Trace
New Construction
Design
Greensboro, NC 27405

Yanceyville Place
New Construction
Design
Greensboro, NC 27405

Downtown Greenway Phase 4
Infrastructure
Bidding
$17,300,086 CJ est. value
Greensboro, NC 27401

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

RFP Construction Manager-at-Risk - New Student Recreation and Wellness Center
New Construction, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Greensboro, NC 27411

Elm Towers Public Restroom Rehabilitation
Renovation
Results
$200,000 est. value
High Point, NC 27260

Sandy Ridge Road Water Line Improvements
Infrastructure
Results
$973,705 CJ est. value
Greensboro, NC 27235

Printworks Mill
Renovation - 421,845 SF
Construction
$54,000,000 est. value
Greensboro, NC

Coapman Street Apartments
New Construction - 55,762 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Greensboro, NC 27407

Greensboro Apartments
New Construction, Demolition - 153,653 SF
Pending Verification
$10,000,000 CJ est. value
Greensboro, NC 27403

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

The Reserve at O'Henry I
New Construction
Conception
Greensboro, NC 27401

West Wendover Avenue Apartments
New Construction
Design
$90,500,000 est. value
High Point, NC 27265

Last Updated 06/12/2023 11:12 AM
Project Title

Wolfetrail Road Multi Residential

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27406   (Guilford County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of up to 200 multifamily units. As of June 12, 2023, this project is in the early planning stages, and received rezoning approval from the Greensboro City Council. No building permits have been issued at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents