Similar Projects
Signage
Term Contract
Bidding
Los Angeles, CA 90073

Traffic and Street Name Sign Post
Infrastructure
Post-Bid
CA

Install roadside warning signs
Infrastructure
Post-Bid
$1,770,000 est. value

Install Metal Beam Guardrails
Infrastructure
Results
$16,400,000 est. value
CA

Annual Guardrail Maintenance
Alteration
Results
$45,000 est. value
CA

Cold Plane, and Place Rubberized HMA and Rumble Strips
Infrastructure
Post-Bid
$2,180,000 est. value
CA

Remove and Install Roadside Signs and Overhead Sign Panels
Infrastructure
Results
$4,430,000 est. value
CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Guardrail Repair or Replacement Services
Infrastructure
Results
CA

SB Minor B Remove Exist MBGR and Install Midwest Guardrail System
Infrastructure
Post-Bid
$300,000 est. value
CA

Guardrail Repair and Replacement
Infrastructure
Results
CA

Install Guardrails and Construct Retaining Walls
Infrastructure
Results
$5,700,000 est. value
CA

Guardrail Repair and Replacement in Los Angeles County
Infrastructure
Results
CA

Guardrail Services in Los Angeles County
Infrastructure
Results
CA

Citywide Guardrail Upgrade
Term Contract
Results
Santa Clarita, CA

Last Updated 04/06/2022 01:13 AM
Project Title

ADA Ramp Installation

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90012   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The DVBE Participation Program applies and a three percent (3%) Provide all labor, tools, materials, equipment, and incidentals to demolish the remaining full upper length of the existing walkway. A partial demolition of the existing lower ramp has already been demolished and removed. Remove all demolished debris offsite. At the same location, install a new wheelchair and pedestrian access ramp of approximately 77 linear ft. of ramp and hand railings in compliance with the 2019 Americans with Disabilities Act (ADA) at the Caltrans District 7 Headquarters

Details

Division 31 - Earthwork, Earth Stripping and Stockpiling.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents